铜箔腐蚀刻胶结构作为阻挡结构.ppt

强子物理研究和 GEM膜的研制探索 李笑梅 中国原子能科学研究院 核数据重点实验室 2012.12 JLab 12 GeV Upgrade Project Upgrade is designed to build on existing facility: vast majority of accelerator and experimental equipment have continued use New Hall Add arc Enhanced capabilities in existing Halls Add 5 cryomodules Add 5 cryomodules 20 cryomodules 20 cryomodules Scope of the project includes: Doubling the accelerator beam energy New experimental Hall and beamline Upgrades to existing Experimental Halls Maintain capability to deliver lower pass beam energies: 2.2, 4.4, 6.6…. Upgrade arc magnets and supplies CHL upgrade

文档评论(0)

1亿VIP精品文档

相关文档