- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CONTRACT FOR PROJECT INSTALLATION
This Contract for project of installing Main Engine is made
on_________, by and between _________ Company Ltd. (here-
inafter called Party A) and _________ Company Ltd.
(hereinaftercalled Party B ).
1.Name of installation work: _________.
2.Location of installation work: Party As_________in Port
A.
3.Scope of installation work: As specified in the drawingsand
statement attached.
4.Time limit for completion:
The installation work shall cordinate with the construction
of _________ in Party A, and shall be completed, including
thetrial run for _________, within _________days after the
completion of _________.
5.Total price of installation work:_________U.S. D only.
6.Payment terms of installation work:
First installment:
Party A shall pay to Party B fifteen percent of the total
pricefor installation work , i.e._________U.S.D only, when
thiscontract comes into effect.
Second installment:
Party A shall pay to Party B fifteen percent of the total
pricefor instalatiorn work, i.e_________U. S. D. only, at the
commencement of construction installation.
Third installment:
Party A shall pay to Party B ten percent of the total pricefor
installation work, i.e._________U. S. D. only, duringthe
installation of pipes.
Fourth installment:
Party A shall pay to Party B forty percent of the total
pricefor installation work , i.e._________U. S. D. only, at
thetime when the main equipment arrives at the site.
Fifth installment:
Party A shall pay to Party B ten percent of the total pricefor
installation work,i.e._________U. S. D. only,upon comple - tion
of the installation work.
Sixth installment:
Party A shall pay to Party B ten percent of the difference
of the price for installation work , i.e._________U. S. D. only,
after the work received has been proved qualified.
7.Penalty for def
您可能关注的文档
- a公司与b公司就c公司之远期股权处置协议.pdf
- C类资金信托合同(特定受益类)[适用各方].pdf
- ICC一般销售条款(B).pdf
- ktv的装修施工合同.pdf
- NPS支付系统合作协议书.pdf
- OEM委托加工合同.pdf
- SalesAgencyAgreement(销售代理合同英文版).pdf
- SalesContract(销售确认书英文版).pdf
- 安徽省城市房屋拆迁补偿安置协议.pdf
- 安徽省商品供销合同(官方范本).pdf
- CO-SALEAGREEMENT(英文合同范本).pdf
- CreditEnhancementAgreement(英文合同范本).pdf
- FacilitiesUseAgreement(英文合同范本).pdf
- IntercreditorAgreement(英文合同范本).pdf
- 报价转让协议书.pdf
- JointVentureAgreement(英文合同范本).pdf
- LabourContract(英文合同范本).pdf
- LEASECONTRACT(英文合同范本).pdf
- LimitedLiabilityCompanyAgreement(英文合同范本).pdf
- LOANCONTRACT(英文合同范本).pdf
文档评论(0)