火力发电厂基本建设工程启动及竣工验收规程(Code for acceptance of start-up and completion of basic construction projects of thermal power plants).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
火力发电厂基本建设工程启动及竣工验收规程(Code for acceptance of start-up and completion of basic construction projects of thermal power plants)
Notice of the Ministry of power industry on Issuing the procedures for the commissioning and completion acceptance of the basic construction projects of thermal power plants
In order to meet the increasing demand of large thermal power units and automation,
Strengthening acceptance and acceptance of thermal power construction projects,
enter
Step by step improve the quality of thermal power projects, give full play to the effectiveness of investment, according to the State Planning Commission issued the construction project (project) completed
Measures for acceptance
I will
One thousand nine hundred and eighty
The regulations on acceptance and acceptance of the basic construction project for thermal power plants issued in 2004, revised to firepower
Code for acceptance of construction and completion of capital construction projects of power plants
It is hereby issued to you, please implement it in accordance with the actual situation, and
Will be in the implementation of the issues and opinions of the Ministry of construction and coordination department.
Basic construction project of thermal power plant
Specification for starting and final acceptance
One
General provisions
1.0.1
The basic construction of the thermal power plant is before the commissioning of each unit,
Must start the acceptance in time,
In this issue, the whole project
After the completion of the Department, must be completed in time for acceptance.
Start acceptance is a comprehensive inspection of production units and the corresponding construction and installation engineering design,
Equipment,
Construction,
Commissioning quality and production
The important part of preparation is to ensure that the unit will be safe, economical, fast, reliable, integrated and civilized in production and production
Productivity,
Key procedures for achieving investment effectiveness.
Unit with
您可能关注的文档
- 基于数据库安全审计的研究_信息管理_基础信息化_4691.doc
- 冷库可行性研究报告 万吨气调库建设项目可研报告.doc
- 模具专业术语_机械仪表_工程科技_专业资料.doc
- 企业-化学品泄漏处理演练.doc
- 浅谈新能源发展下的我国智能电网建设.doc
- 八年级(上)历史与社会第四单元第一课测验试卷.doc
- 保险公司保险论文范文-对于从“”中保险业人才培养模式的创新word版下载.doc
- 不同施氮水平下棉花生物量动态增长特征研究.doc
- 基于PC平台的旋压机数控系统的研制.doc
- 基于关系理论的建筑劳务用工制度探讨.doc
- 2025年养老社区智慧服务平台建设项目可行性研究报告.docx
- 2025年航空航天创新研发中心项目可行性研究报告.docx
- 2025年医疗器械研发创新项目可行性研究报告.docx
- 2025年先进制造业集群发展项目可行性研究报告.docx
- 2025年智慧农业产业链整合项目可行性研究报告.docx
- 2025年移动支付技术开发与应用项目可行性研究报告.docx
- 2025年高效氢气储存材料研发项目可行性研究报告.docx
- 2025年城市公园智能监控系统建设项目可行性研究报告.docx
- 2025年农闲季节社区文化活动方案可行性研究报告.docx
- 2025年智能化供应链管理系统项目可行性研究报告.docx
最近下载
- 一、课程性质与基本理念——2025年版《普通高中课程标准》思想政治(wor.pptx VIP
- 质子治疗与护理.pptx
- 2025至2030中国智能家居行业市场渗透率及增长机会研究报告.docx
- 皮带式抽油机结构原理.pdf VIP
- 《精彩人生—职业生涯规划》中职生职业生涯发展全套教学课件.pptx
- 李清照《声声慢》完整教学课件.ppt VIP
- DL-T5210-2021电力建设施工质量验收及评价规程最新表格.docx
- 在线网课学习课堂《雷达原理》单元测试考核答案.docx VIP
- 《工程勘察设计收费标准》2002年修订本完整.pdf VIP
- 服装行业智能化产业生态构建策略研究:2025年现状与未来五到十年展望.docx
原创力文档


文档评论(0)