【精品文档】中英文双语土木工程工程造价相关的毕业设计外文文献翻译成品:工程造价管理.docx

【精品文档】中英文双语土木工程工程造价相关的毕业设计外文文献翻译成品:工程造价管理.docx

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
此文档是毕业设计外文翻译成品( 含英文原文+中文翻译),无需调整复杂的格式!下载之后直接可用,方便快捷!本文价格不贵,也就几十块钱!一辈子也就一次的事! 外文标题:Project Cost Management 外文作者:Low Sui Pheng 文献出处:Project Management for the Built Environment,2018:97-112(如觉得年份太老,可改为近2年,毕竟很多毕业生都这样做) 英文4347单词,中文6851汉字。 Project Cost Management Having identified the resources needed to complete the project, it is now necessary to estimate how much each of these resources cost. The sum of all costs related to all resources is the total project costs. Cost estimating is the process of calculating and computing the costs of all the resources that have been identified to be necessary to complete the project. Such resources can be identified from the project scope statement, work breakdown structure, components and activities. Cost estimates for resources can in turn be affected by quality choice, risk influence and procurement matters. Resources typically include materials, manpower and machine. In addition, costs of these resources can be influenced by management competence, methods of construction and money to fund the project. Collectively, this can be abbreviated as the 6 M’s. Estimating the costs of resources can be affected by economic conditions, currency fluctuations, market competition and other variations such as those relating to availability as well as demand and supply situation. Introduction These may collectively affect the total costs of the estimates. Upon completion of cost estimating, the cost estimates for resources are derived. These show the costs needed to procure the resources necessary to complete the project. However, costs to the builder are not the same as costs to the client. The builder adds a pro?t margin to his costs that will then show up as a price to the client. Apart from identifying the resources needed to complete the project, the quantities of such resources must also be determined correspondingly. The amount of resources or the duration needed to use the resources is in turn estimated using labour constants and equipm

您可能关注的文档

文档评论(0)

peidong88 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档