- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Two of four roofs of the complex will be greening by means of approximately 25cm depth ecological structures. 在二个屋顶建造深约25cm的生态屋顶(南侧和中间屋顶) Innovative design 创新设计 Construction of the eco-roof in South Building 施工中的南侧大楼生态屋顶 Eco-roofs 生态屋顶 Construction of the eco-roof in Center Building 施工中的中间连接大楼生态屋顶 Three bioretention cells are built to treat the stormwater of the grey roof of North Building;处理北侧屋顶雨水的生态滞蓄池 A nature drainage system is used to transfer the treated water and runoff in the courtyard to raingarden;自然排水系统 The rain garden is built for treating stormwater in the courtyard;雨水花园 The multifunctional detention pond is designed to regulate stormwater and use as landscaping. The south part of the detention pond is designed in the type of wetland to purify the stormwater.多功能调节池 Innovative design 创新设计 LID facilities in the courtyard LID设施 深圳大学建设工程生态技术研究所创新技术 LID facilities in the courtyard 地表LID设施 Natural Drainage system 自然排水系统 Raingarden雨水花园 Bio-retention Cells 生态蓄水池 Wetland湿地 Landscaping pond多功能蓄水池 A 1kW pump is installed to pump the pond water into the raingarden. 1kW水泵 A triangular weir in the middle of the natural drainage system is installed to measure the surface runoff when it is raining, and it also used for the hydraulic experiment class for the students.学生实验用三角堰 The strawberry garden will plant strawberry, vegetables and other fruits to make the students know where the foods come from.草莓园 To utilize the treated water from the eco-roofs, two 2m3 cisterns are installed in the courtyard. 蓄水箱 Innovative design 创新设计 Bio-retention cells 生态滞蓄池 strawberry garden草莓园 Measurement and experimental analysis 观测与实验分析 Each of these eco-roofs and bioretention cells will be continuously monitored for flow, with composite sampling of every runoff event in the beginning two years. As mentioned above, the flow of the eco-roof of Center and North Buildings will be measured by four outlet controls comprising 60°V-Notch weir and tee. Collected samples will be composited to ob
您可能关注的文档
最近下载
- Module 3 Unit 1 They're all my favourite festivals!(课件)-五年级英语同步备课(外研版一起).pptx VIP
- 教师资格考试基本能力第一节阅读理解能力演示教学.ppt VIP
- 2025第三届全国技能大赛海南省选拔赛-餐厅服务(国赛精选)项目技术文件.pdf VIP
- 麻醉药品和精神药品培训试题及答案.docx VIP
- 导视标识标牌系统制作安装方案(全面标准版).pdf VIP
- 挖掘机技能竞赛技术方案8660.pdf VIP
- 2023年国际生物奥林匹克竞赛试题-版.doc VIP
- Unit3Let'splaytors(课件)剑桥少儿英语二级下册((1)).pptx VIP
- 【★本书配套课件】5.2 “漫画”老师.pptx VIP
- 数控机床机械装调技术 项目二 数控机床主轴部件的装配与拆卸.ppt VIP
文档评论(0)