The fourth quarter tunnel portal and open cut tunnel A. portal (a) the mouth of the tunnel location choice: Tunnel entrance location selection principles: tunnel entrance location choice should be based on the safe, should according to the topography and geology conditions, consider the stability of the slope, Yang slope, combined with the engineering and construction of the hole degree of difficulty, in line with early into the night out principle, comprehensive and integrated analysis to determine. 第四节 洞门与明洞 一、洞门(portal) (一)洞口位置的选择: 隧道洞口位置的选择原则:隧道洞口位置的选择要在保证安全的基础上,应根据地形、地质条件,