陕西秦岭终南山隧道3#竖井工程
二次衬砌施工组织设计
中铁二十局3#竖井项目部
二00七年八月三十日
? 目? 录
一、编制依据、原则、范围 ·····························2
? 二、工程概况··········································2
? 三、施工准备·······································3? ?
四、施工方案及施工工艺·····························4
五、滑模施工·······································6
六、工期安排及工期保证措施·························11
七、防治水措施·····································13
八 、质量保证措施··································14
九 、冬雨季施工措施································20
十、 安全施工措施··································21
?
? 十一、文明施工·····································26