SOE020408BJ(GB)-workshop * Based on achievement on KPIs and competencies, two Performance Level ratings are established. For KPIs - reaching stretch targets translates to PL1 rating, while reaching Hoshin targets (which are 20%-40% lower than stretch targets) translates to a PL3 rating. Based on the weighted average of the two PL ratings, a combined PL rating can then be calculated. SOE020408BJ(GB)-workshop * Based on achievement on KPIs and competencies, two Performance Level ratings are established. For KPIs - reaching stretch targets translates to PL1 rating, while reaching Hoshin targe
您可能关注的文档
最近下载
- 06CJ06-1 开窗机(一)标准图集.docx VIP
- 中国共产党简史PPT学党史颂党恩跟党走党员党史学习教育专题讲座党课课件.pptx VIP
- 农村公路18座旧危桥改造工程总体安全施工的方案.doc VIP
- 107小学主题班会《学党史 感党恩 跟党走》{范喜娟]【省级】优质课.ppt VIP
- 【中小学】五上五下第二十课时 中流砥柱教学设计公开课教案教学设计课件.docx VIP
- 学党史、知党恩、跟党走”主题班会 课件.pptx VIP
- 新概念3课后答案详解(全).pdf VIP
- 医院泌尿外科工作职责.docx VIP
- 学党史感党恩跟党走.pptx VIP
- (2026年)养老护理员翻身扣背排痰操作培训PPT课件.pptx VIP
原创力文档

文档评论(0)