4. SHT 3503-2017 交工文件表格(3).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SH/T 3503—2017 SH/T 3503—2017 PAGE 426 PAGE 425 SH/T 3503—J319 机组试车条件确认记录 Machine Train Readiness for Test Run Confirmation Record 工程名称: Project Name: 单位工程名称: Unit Name: Equipment Description Equipment Item No. Model Capacity Driver Type Revolution r/min Item Technical Requirement Confirmed by Date Owner/ Supervision Contractor General Contractor Construction Contractor Equipment Manufacturer Equipment Dismantling Inspection Dismantling inspection and restoration shall be completed and recorded as per specification requirements. Auxiliary System The system shall be verified as acceptable. Oil Piping System Flushing and pressure test shall be completed and recorded as per specification requirements. Circulating or Lube Oil Applicable requirements shall be met. Electrical Facility Installation shall be completed, testing qualified, and records made in accordance with the specification requirements. Instrument Interlock and Control System Installation shall be completed, system testing qualified, and records made as per specification requirements. Process Piping System Installation shall be completed, pressure test and purging (cleaning) qualified, and records made as per specification requirements. Machine Train Test Run Plan Specific and clear test run procedure, measures and quality acceptance requirements shall be available. Supporting Operation Process and Conditions Preparation shall be completed as required by the test run plan. Owner’s Responsible Person for Test Run: Confirmation on Test Run Conditions Ready for test run. General Responsible Person for Test Run: SH/T 3503—J320-1 往复式压缩机试车记录 Reciprocating Compressor Test Run Record 共()页 第()页 Page of 工程名称: Project Name: 单位工程名称: Unit Name: Equipment Description Equipment Item No. Model Operating Medium Test Run Type □No-load □Loaded Test Medium Ambient Temperature ℃ Driver Type Revolution r/min Start-up Current A Continuous Running Time h Test Run Date Start-up Timing Inspe

文档评论(0)

HBXTWH + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档