- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SH/T 3503—2017
SH/T 3503—2017
PAGE 426
PAGE 425
SH/T 3503—J319
机组试车条件确认记录
Machine Train Readiness for Test Run Confirmation Record
工程名称:
Project Name:
单位工程名称:
Unit Name:
Equipment Description
Equipment Item No.
Model
Capacity
Driver Type
Revolution
r/min
Item
Technical Requirement
Confirmed by
Date
Owner/ Supervision Contractor
General Contractor
Construction Contractor
Equipment Manufacturer
Equipment Dismantling Inspection
Dismantling inspection and restoration shall be completed and recorded as per specification requirements.
Auxiliary System
The system shall be verified as acceptable.
Oil Piping System
Flushing and pressure test shall be completed and recorded as per specification requirements.
Circulating or Lube Oil
Applicable requirements shall be met.
Electrical Facility
Installation shall be completed, testing qualified, and records made in accordance with the specification requirements.
Instrument Interlock and Control System
Installation shall be completed, system testing qualified, and records made as per specification requirements.
Process Piping System
Installation shall be completed, pressure test and purging (cleaning) qualified, and records made as per specification requirements.
Machine Train Test Run Plan
Specific and clear test run procedure, measures and quality acceptance requirements shall be available.
Supporting Operation Process and Conditions
Preparation shall be completed as required by the test run plan.
Owner’s Responsible Person for Test Run:
Confirmation on Test Run Conditions
Ready for test run.
General Responsible Person for Test Run:
SH/T 3503—J320-1
往复式压缩机试车记录
Reciprocating Compressor Test Run Record
共()页 第()页 Page of
工程名称:
Project Name:
单位工程名称:
Unit Name:
Equipment Description
Equipment
Item No.
Model
Operating Medium
Test Run Type
□No-load □Loaded
Test Medium
Ambient Temperature
℃
Driver Type
Revolution
r/min
Start-up Current
A
Continuous Running Time
h
Test Run Date
Start-up Timing
Inspe
您可能关注的文档
最近下载
- 哈尔滨工程大学试卷2017级《高等数学下》期末试题.doc VIP
- 广东省广州市2024-2025学年高二上学期语文期末统考试卷(含答案).pdf VIP
- 《T_WD 121-2025 中药材产地仓建设与运营指南》.pdf
- 2025医疗器械注册人委托生产质量协议.docx VIP
- 2025年山东省农村商业银行招聘考试(法律)历年参考题库含答案详解.docx VIP
- 大卫不可以儿童绘本.pdf VIP
- 2025内蒙古交通集团有限公司社会化招聘100人笔试备考题库及答案解析.docx VIP
- 天坛玉格(奏授法职).docx VIP
- 围墙、绿化、室外铺装、景观、给排及消防水、配电、照明、弱电智能化系统施工组织设计210页.docx VIP
- ISO11135-2023年中文翻译解析.docx
原创力文档


文档评论(0)