岳圣山煤业二期工程施工组织设计
目 录
前言···························································1
工程概况················································3
施工准备工作···········································15
施工方案及施工方法·····································16
揭煤等特殊地层的施工方法·······························26
施工辅助系统···········································27
施工机构设置···········································44
施工进度计划及工期保证措施·····························46
工程质量保证体系·······································48
施工安全措施···········································57
文明施工、环保、消防措施及安全质量标准化···············92
附图