PID 培训资料-莱茵TUV - 图文-.docVIP

  • 3
  • 0
  • 约1.39千字
  • 约 11页
  • 2020-07-10 发布于陕西
  • 举报
Reporting / Results Test report will be issued If Pmpp degradation at STC 5% DUT is considered having passed the specifications. Components to be listed in detail: - Cell - Encapsulation material - Superstrate 21 Reporting / Results Re-test recommendation for changes, such as: Cell type: - modifications listed in the IECEE retesting guideline, - Surface treatments changes are critical too Encapsulation material: - modifications listed in IECEE retesting guideline Superstrate: - change in thickness - surface treatment on the cell side - material composition - Glass type or supplier 22 4. C

文档评论(0)

1亿VIP精品文档

相关文档