TECHNICAL SPECIFICATIONS FOR CONSTRUCTION QUALITY OF BUILDING GRADE FOUNDATIONS
key pointS of quality control
Basic construction conditions of building foundations
Geotechnical exploration data of rock and earth engineering.
The design document and other technical documents are available, the construction drawings have been jointly checked up, the necessary technical delivery and training have been accomplished.
Earthwork
General requirement:
Balance calculation on excavating and filling should be accomplished before earthwork construction, considering minimum transporting distance, reasonable transporting path and reasonable construction procedure and other factors synthetically, properly allocate the earthwork, reduce repeated excavation and transportation.
Ground drainage and dewatering should be done before excavation
The gradient of the site surface should be in accordance with designing requirement, if without specific requirement, the gradient of drainage direction should not be less than 2‰. The site surface should be checked per point. Set one checking point every 100~400m2, and check points should not be less than 10 points; set 1 point every 20m
The plan position, level elevation and side slope grade should be measured often during earthwork construction. Reliable protecting measurement should be applied to plan-control piling and level-control point, and check or review should be done periodically. Soil shouldn’t be placed at the edge of foundation pit.
Excavation of soil:
Before excavation, setting-out, drainage and dewatering should be checked, and transporting road of vehicles and dump area of soil should be arranged reasonably .
The construction scheme, environment protecting measurement and supervision scheme should be worked out according to excavating depth, geological conditions, construction method, environment, project period, climate and ground loading and other information, and the excavation of foundation pit (groove
您可能关注的文档
最近下载
- ASMR简单介绍课件.pptx
- 瞭望&光大:2023商业银行数据资产估值白皮书.pdf VIP
- 2025年山西林业职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 艾滋病合并肺孢子菌肺炎诊疗专家共识(2024年版).pptx VIP
- 2024年山西电力职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 影视项目可行性研究报告.docx VIP
- 2024年山西职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 十一人制足球规则.ppt VIP
- 中考语文阅读理解《石矶娘娘是什么岩石》含答案解析.docx VIP
- [特种设备高级考试]第四,五章 磁粉检测的器材和设备.pdf
原创力文档


文档评论(0)