基础施工技术要求(英文).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Page PAGE 1 of 11 TECHNICAL SPECIFICATIONS FOR CONSTRUCTION QUALITY OF BUILDING GRADE FOUNDATIONS key pointS of quality control Basic construction conditions of building foundations Geotechnical exploration data of rock and earth engineering. The design document and other technical documents are available, the construction drawings have been jointly checked up, the necessary technical delivery and training have been accomplished. Earthwork General requirement: Balance calculation on excavating and filling should be accomplished before earthwork construction, considering minimum transporting distance, reasonable transporting path and reasonable construction procedure and other factors synthetically, properly allocate the earthwork, reduce repeated excavation and transportation. Ground drainage and dewatering should be done before excavation The gradient of the site surface should be in accordance with designing requirement, if without specific requirement, the gradient of drainage direction should not be less than 2‰. The site surface should be checked per point. Set one checking point every 100~400m2, and check points should not be less than 10 points; set 1 point every 20m The plan position, level elevation and side slope grade should be measured often during earthwork construction. Reliable protecting measurement should be applied to plan-control piling and level-control point, and check or review should be done periodically. Soil shouldn’t be placed at the edge of foundation pit. Excavation of soil: Before excavation, setting-out, drainage and dewatering should be checked, and transporting road of vehicles and dump area of soil should be arranged reasonably . The construction scheme, environment protecting measurement and supervision scheme should be worked out according to excavating depth, geological conditions, construction method, environment, project period, climate and ground loading and other information, and the excavation of foundation pit (groove

文档评论(0)

zzqky + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档