美国某工程勘察报告.docVIP

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
GEOTECHNICAL INVESTIGATION REPORT THE RENEWAL OF UNDERBRIDGE WEE WAA – 600.500KM June 2004 PAGE 5 Wee Waa (600.500km) 7690 TABLE OF CONTENTS TOC \o 1-3 \h \z 1. Introduction 2 2. SITE Description 2 3. Topography and Geology 2 4. Investigation Methodology 33 5. Subsurface Conditions AND APRAISAL 33 5.1 Silty Clay - Layer (1) 33 5.2 Mixed Soil Layer - Layer (2) 44 5.3 Silty Clay - Layer (3) 44 5.4 Sand and Silt - Layer (4) 86 5.5 Simplified Geotechnical Model 86 5.5 Laboratory Testing 86 5.5 Foundation Treatment and Geotechnical Proposal 97 5.5.1 Shallow Footings (Option 1) 97 5.5.2 Pile foundation (Option 2) 108 6. CONCLUSIONS AND RECOMMENDATIONS 109 7. FURTHER INFORMATION 1210 Drawings GS04-7690 SI 1 Location Plan and Longitudinal Section Appendix: Borehole Logs EFCP Results Laboratory Test Report Introduction In order to obtain the sub-surface information on the foundation of underbridge at WEE WAA 600.500km on the North West Narrabri to Walgett Branch Line, a geotechnical investigation was carried out on 25th May 2004 and completed on 29th May 2004 by RIC Geotechnical Services. The main structures of this bridge include more than 60 timber openings and several steel openings, with different spans, totalling approximately 388m. For a safe and long term service, many timber openings need to be repaired or stabilised/reinforced, therefore, renewal of this bridge seems increasingly critical to avoid much maintenance cost and high risks. This geotechnical investigation was mainly focused on general engineering properties of substrata in the bridge foundation and abutments. This report presents the results of the geotechnical investigation and proposes geotechnical design parameters/options for foundations of underbridge to be renewed. SITE Description The ground is well forested with vegetation. The Namoi River flows from Up side towards Down side Topography and Geology The project site is located at an area of alluvial plain o

文档评论(0)

139****6621 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档