完整版国外项目分包合同样本 中英对照.docx

完整版国外项目分包合同样本 中英对照.docx

  1. 1、本文档共51页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
分包合同协议 SUBCONTRACT AGREEMENT 该合同签订于 2014年__月_日,签订地址: THIS AGREEMENT is made the day of 2014,at 合同双方 BETWEEN 甲方:是在—法律下单独构成、成立的一个公司,其公司总部在: 在(国家) 注册的办公室在:地址 (以下称为 承包商” M/s Xin jia ng Beix in Road Bridge Group Co., Ltd a compa ny duly orga ni zed and existi ng un der the laws of the havi ng its Head Office at and registered Office in (Country)at (address) (here in after referred to as Con tractor ) of the one part; 及 乙方: 其办公室位于 (以下称为 分包商”) AND situated atreferred to as the situated at referred to as the (herei nafter Subc on tractor ) of the other part. 鉴于 承包商已经与 业主(以下称为 业主”签订了一个合同(以下称为 主合同”)关于执行 —(项目名称) (以下称为 项目”的施工合同。工程师是 (工程师名称)(以下 称为工程师)° WHEREAS The Con tractor has en tered into a Con tract (here in after referred to as the “ Main Con tract with (Employer) , (here in after referred to as the Employer ) for the Con structi on Con tract for (here in after referred to as the “ Project The Engin eer is (Engin eer) (here in after referred to as the “ Engin eer ). 承包商已经出标分包工程范围为 (以下称为分包工程”)由承包商施工主合同工 程(以下称为 主合同工程”)的部分工程,其分包工程按照主合同规定的条款及条件实施除 非本分包合同(以下称为 分包协议或分包合同”)有其他规定,及 The Con tractor has offered to sublet certa in works with scope of (here in after referred as “ Subcontract Works ” ) which as part of works to be executed by the Contractor under the Main Contract (hereinafter referred to as the “ Main Contract Works ”), under the terms and Conditions as described in the Main Contract unless otherwise stated in this Subcontract Agreement (hereinafter referred to as the Subcontract Agreement or Subcontract) to the Subcontractor and 同时分包商已经同意作为分包商执行该工程, 并同意完成分包工程的施工及维修, 其分包工 程在承包商的指示及监督下实施, 并严格按照分包商合同规定的条款执行及业主与承包商签 订的主合同条款实施工程。 While the Subcontractor has agreed to execute the said works as Subcontractor, and to complete and maintain the proposed part of the Subcontract Work herein agreed, under the direction and supervision of the Contractor and strictly in accordance with the provisions stipulated in the Subcontract as well as Main Contract

文档评论(0)

wangsux + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档