附录4:库鄯管道减压站更换xv1101阀动火实施方案.docx

附录4:库鄯管道减压站更换xv1101阀动火实施方案.docx

附录4:库善E管道减压站更换 XV1101阀动火实施方案 中油西部管道塔里木输油气分公司 库鄯管道减压站更换XV1101阀动火实施 方案 审批人:张建坤 审核人:聂玉江 编制人:姜海斌、胡江锋、王树辉、李军 编制单位:塔里木输油气分公司 编制时间:2008年5月20日 beam and rein forced con crete floor. , Han ger locati on should be correct, in stall n eat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phe nomena. (2) No heat displaceme nt of the pipe, the suspe nders should be in stalled vertically, boom len gth can be adjusted; thermal displaceme nt pipe, han gers should be ? of thermal displaceme nt offset value in the opposite direct ion tilt in