- 10
- 0
- 约2.33万字
- 约 48页
- 2021-03-10 发布于境外
- 举报
* There are conflicting needs in the 4 areas of the objectives and the designer’s choices will be heavily influenced by other factors such as: Rig Capabilities Hoisting Pump pressure Pump rate Pipe handling equipment BOP equipment Deckloading Setback Geologic factors Lithology Formation fluids Pore pressure Rock properties Fracture gradient Cost Availability Rental cost Rig dayrate balance (cost of picking up lay down of rental strings + repair) * The deign should not be done in isolation from the 3 items mentioned Operation The design must allow for the full range of operations requirements
您可能关注的文档
- 斯伦贝谢Next培训定向井PPT 01-04 Coordinate Systems and Magnetic declination 2014.pptx
- 斯伦贝谢Next培训定向井PPT 02-01 Deflection methods.ppt
- 斯伦贝谢Next培训定向井PPT 02-02 Anti colllision and advanced well planning.ppt
- 斯伦贝谢Next培训定向井PPT 02-03 Survey tools and Non-Magnetic Tool Lengths.ppt
- 斯伦贝谢Next培训定向井PPT 02-04 Survey Interpretation and basic calculations.ppt
- 斯伦贝谢Next培训定向井PPT 02-05 MWD and LWD.ppt
- 斯伦贝谢Next培训定向井PPT 03-01-2 General Equipment Overview.ppt
- 斯伦贝谢Next培训定向井PPT 03-03-4 Rotary BHA.ppt
- 斯伦贝谢Next培训定向井PPT 03-05 PDM Bottom Hole Assemblies.ppt
- 斯伦贝谢Next培训定向井PPT 03-06-7 IntroductionToRotarySteerableSystems.ppt
原创力文档

文档评论(0)