焊接工艺评定记录样本和澄清的脚注湾地区.docxVIP

焊接工艺评定记录样本和澄清的脚注湾地区.docx

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
LGVSD/NMWD Project TitleLGVSD/NMWD Novato South Service Area Proejct Project Element No. 13 1st QUARTER – 2012 LGVSD/NMWD Novato South Service Area Project 1st Quarter Report – March, 2012 ELEMENT No. 13 - LGVSD/NMWD Novato South Service Area Project (Las Gallinas PROJECT DESCRIPTION Service to the Hamilton Field area would be established through implementation of a 0.7 mgd tertiary treatment upgrade at the existing LGVSD WWTP or expansion of an existing tertiary treatment facility within the fence line of the existing LGVSD WWTP, construction of a new booster pump station onsite, and construction by NMWD of a pipeline distribution system from the LGVSD WWTP north to serve the Hamilton Field area. This system would originate at the LGVSD WWTP and extend north through grazing land. The alignment would turn west along St. Vincent’s Drive then north adjacent to the Northwest Pacific Railroad (NWPRR) right-of-way. At the north end, the alignment will make a loop around the Coast Guard Housing area by following South Oakwood Drive, Casa Grande Drive, Hangar Drive and connecting back along South Palm Drive PROJECT INFORMATION (May 2009 The start date may vary by Project and should not start any earlier than Oct. 1, 2008 which is the earliest matching date. The next reporting period will be April 1, 2012 – June 30, 2012. – Mar 31, 2012) The start date may vary by Project and should not start any earlier than Oct. 1, 2008 which is the earliest matching date. The next reporting period will be April 1, 2012 – June 30, 2012. Legal Matters None Engineering Matters None Environmental Matters None Status of permits, easements, rights-of-way and approvals For LGVSS all required permits, rights-of –way and approvals have been obtained. For NMWD, Railroad (i.e., SMART) and City of Novato encroachment permits have been obtained as necessary for completion of the work. Major accomplishments through Mar 31, 2012 LGVSD has accomplished the following: The design of the tre

您可能关注的文档

文档评论(0)

DKman_81 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档