面向负荷的生产控制与JIT生产(英文版).pptxVIP

  • 1
  • 0
  • 约1.92千字
  • 约 21页
  • 2021-07-02 发布于北京
  • 举报

面向负荷的生产控制与JIT生产(英文版).pptx

Load-oriented manufacturing control just-in-time production for job shops;Introduction;content;1. Objectives of load-oriented manufacturing control;2. Structure of load-oriented manufacturing control; Multi-level closed-loop control system Higher controller level depends on the performance of the lower one.;3. Basic concept in load-oriented manufacturing control 3.1 Basic relationship at a Work center; Basic relationship at work center to plan the Input, Output, Inventory and Lead time load limit = Planned output * (Planned lead time + Planning period) Planning period;.;.;A considering the available capacities of a short-term planning periods(1~2Week) Planned orders were scheduled backward Selects periodically those of the planned orders Step1. Establish urgent orders Step2. Release wotrkable orders Time limit;.;3. Basic concept in load-oriented manufacturing control 3.4 Technique of load-oriented order entry;.;.;4.Overview of a load-oriented manufacturing control system;. ;5.Example of the control system;.;Conclusion;9、春去春又回,新桃换旧符。在那桃花盛开的地方,在这醉人芬芳的季节,愿你生活像春天一样阳光,心情像桃花一样美丽,日子像桃子一样甜蜜。11月-2011月-20Sunday, November 22, 2020 10、人的志向通常和他们的能力成正比例。22:19:5222:19:5222:1911/22/2020 10:19:52 PM 11、夫学须志也,才须学也,非学无以广才,非志无以成学。11月-2022:19:5222:19Nov-2022-Nov-20 12、越是无能的人,越喜欢挑剔别人的错儿。22:19:5222:19:5222:19Sunday, November 22, 2020 13、志不立,天下无可成之事。11月-2011月-2022:19:5222:19:52November 22, 2020 14、Thank you very much for taking me with you on that splendid outing to London. It was the first time that I had seen the Tower or any of the other famous sights. If Id gone alone, I couldnt have seen nearly as much, because I wouldnt have known my way about. 。22 十一月 202010:19:52 下午22:19:5211月-20 15、会当凌绝顶,一览众山小。十一月 2010:19 下午11月-2022:19November 22, 2020 16、如果一个人不知道他要驶向哪头,那么任何风都不是顺风。2020/11/22 22:19:5222:19:5222 November 2020 17、一个人如果不到最高峰,他就没有片刻的安宁,他也就不会感到生命的恬静和光荣。10:19:52 下午10:19 下午22:19:5211月-20

文档评论(0)

1亿VIP精品文档

相关文档