- 1、本文档共200页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Gay is now a provincial key construction project of aluminum Ltdprovince with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadership of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical innovation project of the year, started and completed a series of bids and completed to date,
from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other
building m
您可能关注的文档
- 中国古代文学史完整笔记.pdf
- 中国石油化工股份有限公司某分公司装置及油罐区山体滑坡隐患治理可行性研究报告.pdf
- 中国石油大学(华东)C语言在线测评答案 第10章字符串(2013级亲测正确).pdf
- 中国石油大学(华东)全尺寸钻井实验系统功能说明-20170906.pdf
- 中国石油大学油田化学实验报告实验三钻井液钙侵及处理.pdf
- 中国石油天然气股份有限公司油气田地面建设工程(项目)竣工验收手册(2010年修订版).pdf
- 中国石油山西分公司侯马油库工程可行研究报告.pdf
- 中国石油工程设计大赛方案设计类作品-地面工程单项组东舟工程.pdf
- 中国石油集团公司企业文化建设研究毕业.pdf
- 中国矿业大学(北京)本科生毕业设计(论文)撰写规范(2012届).pdf
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
文档评论(0)