- 1、本文档共42页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CONDITIONS OF SUBCONTRACT
FOR WORKS OF CIVIL
ENGINEERING COSNTRUCTION
Part I- General Conditions
Part II- Guidance for the Preparation of Condition of
Particular Application
With Forms of Offer and Agreement
(For use in conjunction with the Conditions of Contract for
Works of Civil Engineering Construction, Forth Edition 1987
Reprinted 1992 with further amendments)
1st Edition 1994
ACKNOWLEDGEMENTS
FIDIC extends special thanks to Christopher R. Seppala and Maurizio Ragazzi,
White Case, Paris, for acting as the principal drafter of this document.
This contribution to FIDIC and the profession is highly appreciated.
The draft was reviewed initially by Mario Asin of TAMS, USA and Edward
Corbett of Corbett Co., UK and subsequently by the World Bank, European
International Contractors, the International Bar Association and ConSpec,
all of whom provided valuable comments. Advice on insurance matters was
provided by Martyn J. Nixon of Willis Corron, London.
The preparation was carried out under the general direction of the FIDIC
Contracts Committee comprising K.B (Tony) Norris, Consulting Engineer, UK;
Michael Mortimer-Halwkins of SwedPower, Sweden; and John Bowcock of Sir
Alexander Gibb Partner Ltd. UK.
FIDIC wishes to record its appreciation of the time and effort devoted by
all the above.
The ultimate decision on the form and content of the document rests with
FIDIC.
CONTENTS
PART I:GENERAL CONDITIONS
Definitions and Interpretation
1.1 Definitions
1.2 Headings and Marginal Notes
1.3 Interpretation
1.4 Singular and Plural
1.5 Notices, Consents, Approvals, Certificates, Confirmation and
Determinations
1.6 Instructions in Writing
General Obligations
2.1 Subcontractor ’s General Responsibilities
2.2 Performance Security
2.3 Programme to be submitted by Subcontractor
2.4 Assignment o
您可能关注的文档
- B2驾驶证理论考试综合题库.pdf
- bec中级口试真题.pdf
- AS2017-《小米监控实践之路》-陈帅.pdf
- BIM战略合作框架合同协议书范本.pdf
- BIM相关软件介绍.pdf
- boost斩波电路_升压斩波电路_电力电子技术课程设计报告书.pdf
- buck变换器设计报告.pdf
- B商业银行经营管理试卷.pdf
- C630时间定额标准.pdf
- c++编程题题库完整.pdf
- 一城一云服务城市高质量发展白皮书(2023).pdf
- 中国连锁餐饮企业资本之路系列报告(2023)-历尽千帆,厚积薄发.pdf
- 有色金属行业专题研究:未来焦点,钒液流电池储能风潮兴涌.pdf
- 中国 “一带一路”实践与观察报告.pdf
- 医药生物-消费器械行业2023年中报总结:积极拥抱高璧垒高成长(202309).pdf
- DB50T 699-2016 简易升降机检验规则.pdf
- DB50T 746-2016 水库大坝安全监测资料整编分析规程 .pdf
- 看DAO2025-未尽研究报告(2024).pdf
- 市场洞察力报告-数据安全检查工具箱(2024).pdf
- 2024年预见未来:中国元医院建设发展调研报告.pdf
文档评论(0)