- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
china eu india japan korea russia usa;ITER New Organization Structure;Human Resources;Results of STAC-10 Meetmg (1)
STAC discussed cost-saving proposals by 10: eliminating the 19th TF coil and one CS module, and further reducing the scope of the coil cold test at 80K to the first two coils
STAC considers the elimination of the spare TF coil and CS module to be a high risk
STAC still recommends testing all TF, PF and Correction Coils at 80K and cold testing the CS modules at 4K and full current
STAC recommends a final analysis by an expert group to settle the issues of conductor qualification, cold tests, and quench protection
STAC is pleased with the elaboration of ITER operation scenarios
More work is required to analyze the compatibility of ITER core plasma operating modes with divertor requirements
STAC recommends that the IO examine a range of scenarios for early operations;Results of STAC-10 Meeting (2)
STAC recommends that a control strategy/methodology, together with diagnostic requirements, be developed to avoid disruptions and accurately predict impending disruptions and to deploy the mitigation sequence
STAC recommends that IO should be a strong advocate for physics RD and play a more active role in coordinating and prioritizing the RD opportunities in the fusion community
STAC considers the unexpected recent test failures of the CS and TF coils conductors to constitute a very serious issue, with substantial implications for schedule and cost
STAC believes that the triangle of scope, schedule, and cost is challenged by recent developments;Future Analysis;Future Analysis;Report from STAC-11 Meeting (1);Report from STAC-11 Meeting (2)
DG Motojima proposed eliminating the CFC divertor and starting with the full W divertor as a cost saving measure
Will require at least 1 year to develop a basic design for a W divertor
Proposed modification of inner wall blanket shield modules to improve neutron shielding of TF coils
Some deferral of heating syst
您可能关注的文档
最近下载
- 美国史知到智慧树期末考试答案题库2025年东北师范大学.docx VIP
- 8.2 联合国 课件-学年高中政治统编版选择性必修一当代国际政治与经济.pptx
- 小学二年级语文上册统编版第一单元第一单元复习课PPT课件.pptx VIP
- 《谷歌广告培训》课件.ppt VIP
- 二年级语文(统编版)快乐读书吧课件.pptx VIP
- 中国酒与酒文化案例.ppt VIP
- 挤压机800t100t1320t说明sy1000s1000t说明书.pdf VIP
- 《25MN铝合金挤压机液压系统改造》-毕业论文(设计).doc VIP
- 毕业设计(论文)铝型材挤压机液压部分的设计.doc VIP
- 二年级【语文(统编版)】语文园地一(第三课时)ppt课件.pptx VIP
原创力文档


文档评论(0)