英文缩写:
PS (Program start)
项目开始
PSC (Program strategy confirmation)
项目策略确定
PTCC (Program Target Compatibility Check point)
项目目标分解
PTC (Program Target Confirmation)
项目目标确定
PA (Program Approval)
项目批准
LR (Launch Readiness)
投产准备就绪
LS (Launch Sign Off)
投产签收
J1 (Job1)
量产
Use for tooling kick off. 用于开模
Purchasing Related Process/ 采购相关的流程
RFQ
Request for quotation which include Commercial
document and ESOW. Commercial document tells the
commercial items and ESOW tells the product
information and requirements.
询价书包括了商务文件和产品工程规范和要求( ESOW)
ESOW
ESOW1 based on first version drawing for quotation
ESOW2 based on 2nd version drawings for nomination
ESOW3 based on 3rd version drawing for CPA
ESOW1基于第一版图纸,用于询价
ESOW2基于第二版图纸,用于确定供应商
ESOW3基于第三版图纸,用于签订 CPA
CPA
CPA is a commercial contract between Volvo and
suppliers for the commodities. It is for the commodities
price.
CPA是沃尔沃和供应商之间的关于零件价格的合同。
Tooling order / 模具订单
Tooling order is an order to kick off suppliers ’ tooling
with commercial and engineering perspectives.
模具订单是沃尔沃从工程和商务两方面来启动供应商的
模具工作。
PPAP
Refer to STA training later
参考后面 STA 的培训
Purchasing
Drawing related Process/ 图纸相关流程
V0
1st released version drawing. ESOW1 use it. Design supplier need release V0
drawing to Volvo
第一版图纸用于 ESOW1 。设计供应商需要发布 V0 数据到 Volvo 系统
V1
2nd released version drawing. ESOW2 use it. Design supplier need release
V1 drawing to Volvo
第二版图纸用于 ESOW2 。设计供应商需要发布 V0 数据到 Volvo 系统
V2
3rd released version drawing. ESOW3 use it. Can be used for tooling design.
Design supplier need release V3 drawing to Volvo
第三版图纸用于 ESOW3 和模具设计。设计供应商需要发布 V2 数据到 Volvo 系
统
FDJ
Last released version drawing. Used for tooling kick off. Design supplier need
release FDJ drawing to Volvo
最终版图纸用于开模。设计供应商需要发布
原创力文档