- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
排貨流程及策略介紹Dispatch flow and strategy Introduction;Content;Dispatch Purpose strategy;Terminology;IC flow ;Move definition;T/R Definition;Cycle time definition;Fab production Plan;Lot priority class;Traditional manual dispatch operation flow;Now D-Engine operation flow; D-Engine Benefit;Basic Dispatch Strategy-1/13;Basic Dispatch Strategy-2/13;Basic Dispatch Strategy-3/13;Basic Dispatch Strategy-4/13;Basic Dispatch Strategy-5/13;Basic Dispatch Strategy-6/13;Basic Dispatch Strategy-7/13;Basic Dispatch Strategy-8/13;Basic Dispatch Strategy-9/13;Basic Dispatch Strategy-10/13;Basic Dispatch Strategy-11/13;Basic Dispatch Strategy-12/13;Basic Dispatch Strategy-13/13;New D-Engine System Architecture issue; WMB rule : WIP/ Move Balance
Keep total line balance and process the most delay lot first, to complete move target at each process steps, finally achieve maximum output and on time delivery.
SGS loading balance rule
Equipments prior to SGS operation steps must help to balance the loading of SGS scanners for reduce the impact of key scanner’s productivity.;CR 1: means the lot is delayed, and has higher priority to be processed
CR 1: means the lot is ahead, and has lower priority;;Month end CT Cut line priority ;General Rule: WIP Balance;;define upstream and downstream step and it’s weight
How many step for upstream and downstream ?
Base on Cycle time == within CT 16 hr
Different Weight
nearer step more weight, farther step less weight
Weight=(16hr – CT) /16
若沒有STD CT,則先暫訂8站,且出warning report;另外需設計可供user設定“16 hrs與N站”的UI
PS: (600/60) / 24 * 16 = 8;General Rule: Move Balance ?Throughput; General Rule: Move Balance ? n-Hr Move Control;Include step4 – SGS dispatching;Step4: SGS loading ;Exam;Answer :
(1)
(3)
(1)
(2)
(1)
;End;9、 人的价值,在招收诱惑的一瞬间被决定。6月-216月-21Monday, June 28, 2021
10、低头要有勇气,抬头要有低气。05:50:4105:50:4105:506/28/2021 5:50:41 AM
11、人总是珍惜为得到。6月-2105:50:4105:50Jun-2128-Jun-21
12、人乱于心,不宽余请。05:50:4105:50:4105:50Monday, June 28, 2021
13、生气是拿别人做错的事来惩罚自己。6月-216月-2105:50:
文档评论(0)