xxxx实施项目-模拟系统03.realization实现阶段mrp.pptxVIP

  • 0
  • 0
  • 约3.22千字
  • 约 80页
  • 2022-06-13 发布于北京
  • 举报

xxxx实施项目-模拟系统03.realization实现阶段mrp.pptx

浪潮ERP项目组 MRP培训;MRP Objectives;MRP Objectives;R/3 Integration Model;Profitability Analysis Revenue Plans Sales Plans (Quantities);Logistics Chain Overview;Planning Procedures;MRP Chapter 1 - Introduction;;Material Master Record;PP-Relevant Fields in the Material Master;Materials Planning Procedures;MRP Chapter 2 - Prerequisites;;;;Single-Item, Multi-Level Planning;Single-Item, Multi-Level Planning;Differences -Total Planning;;Differences - Single-item, Multi-level;;;;;Planning Run;Net Requirements Calculation for Material Requirements Planning;Maintaining Planned Orders (In-House Production);Determining Order Proposals for External Procurement;MRP Chapter 3 - Carrying Out The Planning Run;MRP Chapter 3 - Carrying Out The Planning Run;;;;Make-to-Order Procedure;Schedule Lines for Make-to-Order Procedure;;;Consumption of Independent Requirement Quantities by Sales Orders;Consuming Quantities in the Demand Program;Consumption Mode;ATP Quantity;;MRP Chapter 4 - Demand Management;Lot Sizing Requirements; Overlapping Time;Requirements Period 05/27 05/31 06/04 06/08 Lengths According to PP Planning Order Proposals Calendar 05/27 05/31 06/04 06/08;Determining Delivery Dates;MRP Chapter 5 - Lot Size Calculation;Scheduling;;;MRP - Basic Dates Scheduling;In-House Production - Lead Time Backward Scheduling Order Order Scheduled Scheduled Order Requirements Release Date Start Date Start Date Finish Date Finish Date Date Release Period Float before

文档评论(0)

1亿VIP精品文档

相关文档