说明教案上午hickory building systems presentation_bt may.pptxVIP

  • 12
  • 0
  • 约1.67千字
  • 约 31页
  • 2022-08-25 发布于北京
  • 举报

说明教案上午hickory building systems presentation_bt may.pptx

;Hickory. The Leading Australian Apartment Builder.;;Hickory Building Systems The Design Process ;幕布(窗户/幕布墙);;The modules are manufactured on a moving fit out line. The production line takes the model adopted by car manufactures whereby efficiencies are gained by the worker remaining in their station and the modules moving to them. Our 1st production line was a static line and the moving fit out line was adopted following Kaizen initiatives ;Low rise modules are fully fit out in the factory;Factory to Site Process;Factory to Site Process;Our low rise system allows Architectural freedom. A modular building doesn’t have to look modular ;Approx. 2000 modules delivered to date 16 projects in 3 states Established Hickory delivery model: 0ne9 Apartments Moonee Ponds - 9 levels up in 5 days 3:East Richmond – modules installed in 11 days Art Series Hotel Bendigo – 128 rooms up in 6 days Adara apartments, Perth – 77 apartments erected in 10 days ;PROJECT Little Hero;PROJECT Pegasus;PROJECT The Nicholson;PROJECT Centvm;;;PROJECT The Schaller Studio;PROJECT Stella Apartments;PROJECT Concorde South;Advantages;Limited resources and a growing population mean we need more sustainable ways to build. ;To meet this projected population growth we will need the resources of 5.4 earths ;Sustainability;Faster Construction;Reduced Costs;Transportable;Case Study: One9 Moonee Ponds 9 level building erected in 5 days;End user benefits 65% faster ROI for developers Safer work environment with less LTIs Less construction waste, manufacturing and transport energy Higher quality control with fewer defects Greater architectural flexibility, building to any height

文档评论(0)

1亿VIP精品文档

相关文档