- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程管理 外文翻译 外文文献 英文文献 浅谈工程索赔的预防与处理
Talking about the project
claim the prevention and treatment
Abstract: In project management, construction claim is a complexbusiness management. Today#39;s domestic project contracting market isbecoming more competitive, successful low-cost has become a regularoperation, the operating contractor for the construction of the claim is veryimportant to achieve the goal. The significance of the claim and described theconcept for today#39;s domestic construction projects in claimsmanagement problems were analyzed and the correspondingcountermeasures and suggestions of the project and counter-claims both sidesclaim the contract is an indispensable business component. Based on theanalysis of the factors that claims the project, discussed the contract on theimplementation of the project claim the deal with the principles and specifictreatment.
Key words: engineering claim prevention deal with1. The definition and classification of claimsClaim the project is the fulfillment of the contract, the contract due to theother party did not fulfill its obligations under the contract and this led tolosses, other demands for compensation or the right to compensation. Theincidence of claims is a two-way, as long as the contract side of theresponsibility and obligation not to achieve contract, or to provide theconditions inconsistent with the contractual status, there are claims that mayarise. It is also a kind of a right, under normal circumstances, the claim refersto the contractor in the implementation of the contract process, the reasonsfor their non-extension of the project, and require owners to increase the costof compensation for the loss of a claim. The owners belong to the constructionunit should bear the responsibility for the cause, and the actual loss to theconstruction of requests for compensation, known as the anti-claim.
1.1 The purpose of their claims can be divided into two categories:
construction claims and claims costs.