《CCC负荷分配简介》.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
;在压缩机网络中,压缩机通常并联运行,有时也有串联运行 形成网络运行的目的包括: 备份 灵活操作 增加额外的能力 通常注重单元机组的运行而忽略网络的优化控制 压缩机制造商通常集中于单元机组的控制。 从“网络”的观点来看,应实现优良的喘振保护和网络的负荷分配优化控制。; 并联机组控制系统的目标是: 保持主性能变量稳定(压力或流量) 将负荷优化分配到网络中的各台机组上,同时: 发生喘振的机率最低。 最低的能耗 在启动或停开单一机组时将所带来的工艺扰动降到???低。;Process;Rc,1;Process;Machine 2 operates with recycle while machine 1 still has turn down;Q2;Notes All controllers are coordinating control responses via a serial network Minimizes recycle under all operating conditions;Machines operate at same Rc since suction and discharge of both machines are tied together;;;The Pressure Override Control (POC) response;Process;;Main selection criteria for FMD in antisurge control system: Repeatability Sufficient signal-to-noise ratio Accuracy of the FMD is not critical FMD delays must be absolutely minimal Present state-of-the-art limits the choice of FMD to head flow meters or to other devices that are based on the principle of velocity measurement: Orifice plates Venturi’s Pitot tubes etc. Recommended flow range for FMD and transmitter is maximum compressor flow Recommended Dp corresponding to Qmax, compressor is 10” WC (250 mmH2O) or more;The preferred location of the FMD: Suction of compressor As close to the inlet flange as possible;The speed of approaching surge is high The transmitter type and brand should be selected based on two major factors: Reliability Speed of response Desired rise time for Dp (flow) transmitters is 200 ms or less Pressure step is 100% The first order response (63%) is less than 200 ms Desired rise time for pressure transmitters is 500 ms or less;Knowing the flow is essential to determine the distance between the operating point and the SCL Damping the Dpo (flow) transmitter destroys essential information;Criteria for antisurge valve sizing based on CCC’s experience Provide adequate antisurge protection for worst possible disturbances Provide adequate antisurge protection in all operating regimes Sized to provide flow peaks greater than what is required in steady state

文档评论(0)

清风老月 + 关注
官方认证
内容提供者

该用户很懒,什么也没介绍

认证主体阳春市惠兴图文设计有限公司
IP属地广东
统一社会信用代码/组织机构代码
91441781MA53BEWA2D

1亿VIP精品文档

相关文档