ABB GEH-5660 Spectra Series Busway Evolution™ Switchboard Stub Connection installation instructions 说明(英语)用户手册.pdf
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GEH-5660 Installation Instructions R01
Spectra Series™ Busway
Evolution™ Switchboard Stub Connection
DANGER: DO NOT perform any installation procedures described
below without de-energizing the Busway/Switchboard AND
ensuring the main circuit breaker device is OFF.
Before Installation
Before any installation work is performed, study all drawings furnished by the supplier for the
installation. These include arrangement drawings (front, end, and plan view), connection diagrams, and
schedule of equipment. Any material exterior to the equipment that may be required to meet any local
codes is not furnished.
Storage Precautions
Before storing, unpack sufficiently to check the busway for possible concealed damage resulting from
shipping and handling. If damage has occurred, notify the shipper immediately. If the busway is free of
damage, restore the packing until ready for installation.
Store indoors in a clean, dry area, preferably close to the installation points.
Protect the busway from mechanical damage and any contact with or exposure to corrosive fumes,
liquids, salts, or concrete.
Failure to store and protect the busway properly can cause serious damage and will void the warranty.
NOTICE: No busway, including outdoor rated, is weatherproof until
completely and properly installed
GEH5660 (Rev. 01)
您可能关注的文档
- ABB 500NMA01 data sheet 数据表(英语)说明书用户手册.pdf
- ABB Batch Digester Fingerprint 数据表(英语)说明书用户手册.pdf
- ABB 2CSE1319EL 2CSE1320EL - Bells and buzzers 手册(英语)说明书.pdf
- ABB Mounting instruction 1V10-1V50 说明(英语)用户手册.pdf
- ABB Specification Guide for RVAC® Direct Replacement AC Medium Voltage Circuit Breakers 指导原则(英语).pdf
- ABB Data sheet - CM-PFE and CM-PFE.2 Three-phase monitoring relays 数据表(英语)说明书用户手册.pdf
- ABB FS-Wandschrank 说明(英语)用户手册.pdf
- ABB Platinum batten LED vandal proof IK10 Nexus® - 2 foot 数据表(英语)说明书用户手册.pdf
- ABB Application Note - Motion Profiles 应用说明文档(英语).pdf
- ABB Manual - C1900 Multi-recipe Profile Controller Versions. Circular Chart Recorder Controllers 手册(英语)说明书.pdf
- ABB Dodge® Type E mounted tapered roller bearings why go anywhere else 白皮书(英语)说明书用户手册.pdf
- ABB Application description - Fluoride Monitoring in Potable Water Treatment 应用说明文档(英语).pdf
- ABB CT MasterMind Ethernet Guide 指导原则(英语).pdf
- ABB Installation and Operating Instructions[EN] 6124-XX-101 手册(英语)说明书.pdf
- ABB Manual - Series 2000 Pressure Transducer User Guide 手册(英语)说明书.pdf
- ABB ACS100 140-IFxx-x filters, Installation Guide 手册(英语)说明书.pdf
- ABB Instructions for using Ekip Touch protection releases and Accessories 手册(英语)说明书.pdf
- ABB PEL-HRA Installation Procedure 说明(英语)用户手册.pdf
- ABB User manual - IBIS-R+ - Configuration and parameter setting software for Digitric 500 and Protronic 100 500 550 手册(英语)说明书.pdf
- ABB Operating instruction - 262 264 revision1 - Addendum for FOUNDATION Fieldbus 手册(英语)说明书.pdf
原创力文档


文档评论(0)