Schneider Electric施耐德SpaceLogic VB2x0R VB3x0R Ball Valves with MB6 Series Two-Position Actuators Installation Instructions安装和用户指南(英语).pdf
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Installation Instructions | 1
SpaceLogic VB2x0R / VB3x0R
Ball Valves with MB6 Series Two-Position Actuators
Inspection Mounting
Inspect the package for damage. If package is damaged, The valves can be mounted in horizontal or vertical piping.
notify the appropriate carrier immediately. If undamaged, When installed in horizontal piping, the actuator must be
open the package and inspect the device for obvious dam- above the valve body. It can be tilted left or right but it must
age. Return damaged products. not be tilted below 90° from vertical.
Requirements
Tools (not provided)
• Wrench 1 to 1-5/8” (25 to 40 mm)
• Pipe wrench according to pipe size
• Volt-ohm multimeter
Training — Installer must be a qualified, experienced techni- 90˚
cian
Horizontal Pipe
Other accessories as appropriate
Horizontal Plane
Notice:
• Electrical shock hazard! Disconnect power before 360°
installation to prevent electrical shock or equipment
damage.
• Make all connections in accordance with the electrical
wiring diagram and in accordance with national and
local electrical codes. Use copper conductors only.
• All conductors shall be provided with insulation rated for
the highest voltage motor and end switch circuits.
• Avoid locations where excessive moisture, corrosive
fumes, explosive vapors, or vibration are present.
• Avoid electr
您可能关注的文档
- Schneider Electric施耐德How to ensure full service on 'Expired Subscription Service' (ESS) packages安装和用.pdf
- Schneider Electric施耐德Quantum EIO 系统规划指南安装和用户指南(中文).pdf
- Schneider Electric施耐德I A SeriesTemperature Transmitter Model RTT80-T with HART Protocol安装和用户指南(英语).pdf
- Schneider Electric施耐德Smart-UPS RT User manual SURT7.5 10K UXI UXICH 220 230 240 Vac Tower RM6U (Manual)安装和用户指南(英语).pdf
- Schneider Electric施耐德871A pH ORP Sensors and Accessories - Installation and Maintenance安装和用户指南(英语).pdf
- Schneider Electric施耐德IBY100, IBX100, INTERBUS-communication module安装和用户指南(英语).pdf
- Schneider Electric施耐德UPS Signalling Bundle for IBM AS 400 & IBMi (IBM Power Systems)安装和用户指南(英语).pdf
- Schneider Electric施耐德Smart-UPS SMT 750 1000 1500 2200 3000 VA 120 Vac RM2U安装和用户指南(英语).pdf
- Schneider Electric施耐德PowerLogic™ PM5500 PM5600 PM5700 series - User Manual安装和用户指南(英语).pdf
- Schneider Electric施耐德ComPacT NS1600b-3200 - 固定式断路器或负荷开关 - 说明页安装和用户指南(中文 英语).pdf
- 强化训练-人教版八年级物理上册第5章透镜及其应用定向测试练习题(含答案详解).docx
- 强化训练-人教版八年级物理上册第5章透镜及其应用定向攻克试题.docx
- 2023-2024学年江苏省南通市海门市八年级(上)期末生物试卷.pdf
- 强化训练-人教版八年级物理上册第5章透镜及其应用定向测试练习题(解析版).docx
- 强化训练-人教版八年级物理上册第5章透镜及其应用定向攻克练习题(含答案详解).docx
- 2023-2024学年江苏省南通市海门市八年级(上)期中生物试卷.pdf
- 强化训练-人教版八年级物理上册第5章透镜及其应用定向攻克试卷(附答案详解).docx
- 强化训练-人教版八年级物理上册第5章透镜及其应用同步训练试题(解析卷).docx
- 2023-2024学年江苏省南通市两县四校联考八年级(上)期中历史试卷.pdf
- 2023-2024学年江苏省南通市两县四校联考七年级(上)期中历史试卷.pdf
文档评论(0)