- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Copyright ? 2010 Worth Publishers
8Heather Luea and Dan SacksP R E P A R E D B Y8.1 Measuring the Costs of Public Projects8.2 Measuring the Benefits of Public Projects8.3 Putting It All Together8.4 ConclusionCost-Benefit Analysis
8Introduction: California Transportation ProblemThe state’s transportation problem:Travel on California’s highway system is increasing 5 times faster than its capacity increases.Population is expected to increase by 20 million over the next 30–40 years.The state has proposed the first high-speed rail system in the United States, covering 800 miles.Voters opted to pay for the projected $68 billion cost through bonds, federal funding, private investment, and revenue from carbon dioxide permits.Analysts concluded the net benefits of rail system were over $133 billion.
8Cost-Benefit AnalysisThis chapter covers cost-benefit analysis.Cost-benefit analysis: The comparison of costs and benefits of public goods projects to decide if they should be undertaken.Cost-benefit analysis is widely used to evaluate potential public programs and projects.
8.1Example: Cost-Benefits Analysis of Highway Construction ProjectWhat are the costs and benefits of the project? In the first year? Over time?
8.1How to measure costs?Cash-flow accounting: An accounting method that calculates costs solely by adding up what the government pays for inputs to a project and calculates benefits solely by adding up income or government revenues generated by the project.Opportunity cost: The social marginal cost of any resource is the value of that resource in its next best use.Measuring opportunity costs faces several challenges.Measuring Current Costs
8.1Economic costs are only those costs associated with diverting the resource from its next best use.Rents: Payments to resource deliverers that exceed those necessary to employ the resource.If labor is efficiently employed, then wages are a social cost.If some workers are unemployed, then we value their time at the value of le
您可能关注的文档
- 钱志芳《礼仪与沟通》第27讲涉外交往原则.pdf
- 钱志芳《礼仪与沟通》第28讲一带一路沿线国家商务礼仪风俗与禁忌.pdf
- 钱志芳《礼仪与沟通》礼仪实训指导书4.doc
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch01.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch02.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch03.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch04.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch05.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch06.pptx
- 乔纳森·格鲁伯-财政学(第五版)gruber_5e_lecture_slides_ch07.pptx
- 吉安县公开招聘专职文明实践员笔试备考试题及答案解析.docx
- 2025重庆枫叶国际学校招聘教师笔试备考试题及答案解析.docx
- 游机队电玩自制联网教程-tplink.pdf
- 2025重庆新华出版集团招聘1人笔试模拟试题及答案解析.docx
- 2025宜宾高新丽雅城市产业发展有限公司公开招聘笔试模拟试题及答案解析.docx
- 2025云南保山市龙陵县勐糯镇人民政府招聘合同制专职消防员1人笔试模拟试题及答案解析.docx
- 11.1生活中常见的盐 九年级化学人教版下册.pptx
- 6.1法律保护下的婚姻 高二政治《法律与生活》课件(统编版选择性必修2)(新版).pptx
- 文昌市中小学教师校园招聘29人笔试模拟试题及答案解析.docx
- 10.1.5 常见的酸和碱(第5课时)课件-九年级化学人教版下册.pptx
文档评论(0)