供热管网安装施工方案
本文介绍了供热管线直埋供热管道施工方案,依据多项技术规范和标准进行编制。施工方案遵循以机械施工为主,人工施工为辅的原则,力求达到工程质量、施工工期、安全生产、环境保护、文明施工等各方面的要求。同时,突出重点、难点项目的施工方案及技术措施,科学组织,合理安排,确保优质高效地完成本合同工程施工任务。施工中还强调了环保意识,合理利用土地资源,创建文明工地等方面的要求。
This project is located on Road 578 and is a XXX。The original pipeline at 0+248-0+340 on the road affected the main lane。and it has now been relocated 14.5 meters to the west of the road。with a total length of about 100 meters。The ditch is 1.2 meters wide with a 37-brick wall and a depth of 1.8 meters。The pipeline is installed using a grooving method and is suspended in the ditch。with XXX used as the material。There are also manholes along the pipeline.
XXX
1.4 n of Pipeline Materials:
XXX。with the XXXXXX spiral welded steel pipes。with a design pressure of 1.6 Mpa and high-temperature hot water as the heating medium。with a supply water temperature of 130°C and a return water temperature of 70°C.
The materials used include 150 meters of DN219 polyurethane seamless steel pipe。60 meters of DN159 polyurethane seamless steel pipe。68 meters of DN108 polyurethane seamless steel pipe。5 DN108 polyurethane seamless steel pipe 90° elbows。2 DN219 polyurethane seamless steel pipe 90° elbows。2 DN159 polyurethane seamless steel pipe 90° elbows。4 DN219 to DN159 variable diameter pipes。4 DN219 to DN108 variable diameter pipes。4 DN108D343H-16C hard-sealed butterfly valves。4 DN159D343H-16C hard-sealed butterfly valves。and 2 DN219D343H-16C hard-XXX.
1.5 XXX:
1) Pipeline n: After the XXX。the original soil is compacted。and a 500mm thick 3:7 cement-soil n is made to the bottom of the n trench。with a n coefficient of not less than 0.96 and a treatment width equal to the width of the ditch bottom.
2) Manhole n: After the XXX。the original soil is compacted。and a 500mm thick 3:7 cement-soil n is made to the bottom of the bottom plate layer。with a n coefficient of not less than 0.96 and a treatment range of 500mm outside the edge of the bottom plate.
2.n Process:
n work
Measurement and layout
XXX
n of p