- 2
- 0
- 约4.06千字
- 约 5页
- 2023-07-04 发布于甘肃
- 举报
漏光检测试验方案
Wind Duct Leakage Detection Program
I. Basis for Preparation
1. Quality Acceptance Code for Ventilation and Air Conditioning Engineering Construction GB50243-2002
2. Technical Code for Ventilation Ducts JGJ141-2004
II. Project Overview
The 03-21 plot project is located in the Yujiapu Finan
原创力文档

文档评论(0)