- 2
- 0
- 约12.74万字
- 约 72页
- 2023-09-12 发布于北京
- 举报
PREFACE
Related to the PT. Indonesia Energi Dinamika CFSPP 2x100 MW project, which will be
constructed in area of PLTU Tenggarong - East tan, drillings in 37 points (in varying depth
from 34 to 60m) of boreholes were performed in si o
原创力文档

文档评论(0)