弹性底座配件在拆装后进行相对湿度测试,确保无吸湿及潮湿现象,再安装耐久产品。
The Cypress of Raleigh 11/21/16
THW
05.11
b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation
only after substrates have um 75 percent relative humidity level measurement.
C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound
and remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install resilient products until they are same temperature as the space where they are to
be installed.
1. Move resilient products and installation materials into spaces where they will be installed at
least 48 hours in advance of installation.
E. Sweep and vacuum clean substrates to be covered by resilient products immedia y before
installation.
3.3 RESILIENT BASE INSTALLATION
A. Comply with manufacturers written instructions for installing resilient base.
B. Apply resilient base to walls, columns, pilasters, casework and cab s in toe spaces, and other
permanent fixtures in rooms and areas where base is required.
C. Install resilient base in lengths as long as practicable without gaps at seams and with tops of
adjacent pieces aligned.
D. Tightly adhere resilient base to substrate throughout length of each piece, with base in
continuous contact with horizontal and vertical substrates.
E. Do not stretch resilient base during installation.
F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base
with manufacturers mended adhesive filler material.
G.
您可能关注的文档
最近下载
- 山东英才学院2019-2020学年第二学期《大学英语Ⅱ》期末考试.docx VIP
- 人教版数学二年级下册第三单元《图形的运动(一)》单元测试卷(含解析).docx VIP
- 热重差热联用热分析_3.pptx VIP
- 山东省威海市2026届数学八上期末统考试题含解析.doc VIP
- 《精神病学》考试题库(选择题).docx VIP
- 中考语文阅读理解《荞麦》含答案.docx
- MY FAIR LADY 窈窕淑女 全英文剧本.pdf VIP
- 菲斯曼-成都天宇暖通WH1D.pdf VIP
- JBT 14449-2024《起重机械焊接工艺评定》.docx
- My-fair-lady窈窕淑女台词.docx VIP
原创力文档

文档评论(0)