- 1
- 0
- 约4.89万字
- 约 17页
- 2025-10-23 发布于北京
- 举报
KnowledgePointsOverviewofSubgradeEngineering
[Example]Thedryandwettypesofroadbedinclude().
A.DryB.ModeratelyhumidC.HumidD.OverhumidE.Humid
『Correctanswer』ABCD
AnswerAnalysisThisquestionexaminestheoverviewofroadbedengineering.Thewetanddrytypeoftheroadbedindicates
thewetanddrystateoftheroadbedinthemostunfavorableseason,andisdividedintofourcategories:dry,wet,wetand
overwet.SeetextbookP68.
[Example]Thedryandwettypesofexistinghighwayscanbedividedaccordingtothe()ofthe
roadbed.
A.Liquidlimit
B.Relative
moisturecontent
C.sticlimit
D.Boundary
consistency
E.Natural
moisturecontent
『Correctanswer』BD
AnswerAnalysisThisquestionexaminestheoverviewofroadbedengineering.Thedryandwettypesoftheoriginal
highwaysubgradecanbedividedaccordingtotherelativemoisturecontentorboundaryconsistencyofthesubgrade.See
textbookP68.
[Example]Thefollowingstructuresthatexcludegroundwaterinclude().
A.Blind
ditchB.
Seepage
ditchC.
Seepage
wellD.Side
ditchE.
Interception
ditch
『Correctanswer』ABC
AnswerAnalysisThisquestionexaminestheoverviewofroadbedengineering.Excludesurfacewaterfacilities:sideditches,
interceptingditches,drainageditches,fallingwater,andrapids;excludegroundwaterfacilitiesblindditches,seepageditches,
andseepagewells.SeetextbookP69.
[Example]Basicrequirementsforroadbed().
A.Hassufficientoverallst
abilityB.Hassufficientstrength
C.Hassufficientwaterstability
D.HasgoodflatnessE.Has
sufficientslipresistanc
原创力文档

文档评论(0)