- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
船舶修理价格表
TARIFF FOR SHIP REPAIRS
中国船舶工业总公司
CHINA STATE SHIPBUILDING CORPORATIONGENERAL NOTES
1. The rates quoted herein are in US dollar $.
2. The rates are applicable to the work carried out during the normal working hour, that is five working days a week, and sixteen hours a day. Any works done outside these hours or on Saturdays and Sundays, National Holidays and yards holidays shall be charged with extra for overtime, ship on voyage repair will be priced extra.
3. All prices quoted herein are for ship repairs carried out in the premises of the shipyard, extra price should be added for such repairs carried out at the port berths, buoys, anchorages according to the actual work to be done.
4. Any vessel during the repair period of repair in the yard, unless agreed by the yard, the Customer shall not be permitted to employ any labor other than the yard to perform repairs.
5. The yard shall not be responsible for the consequences of war, earthquake or causes beyond yards control.
6. All scrapped material except heavy parts of machinery, propeller and tailshafts shall be the yards property.
7. This tariff is applicable to the repair of freight carriers only, repairs of other types of ship are beyond of this tariff scope.
8. This tariff becomes effective from January 1st, 1991, subject to revised price depending on the change in material cost etc. without notice.
CONTENTS
General Services page
Wharfage 1
Mooring and unmooring 1
Shore electric power supply 1
Cooling water supply 1
Fresh water supply 1
Water to ballast tank 1
Fire precautions 2
Garbage disposal 2
Compressed air supply 2
Steam supply 2
Telephone service 2
Ventilation fan 2
Heating lamp for electric motor 2
Gas free inspection 2
Rental of crane 2
Drain pipes 3
Gangway for ship mooring 3
Shipyard pilotage 3
Docking Works
Docking charges 4
Tugs charges 4
Tailshaft 5
Rudder 6
Underwater works 7
Sea chests 7
Sea valves 8
Zinc anodes 8
Bottom plugs 8
Hull Department
Cleaning and
文档评论(0)