- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ACI STRUCTURAL JOURNAL TECHNICAL PAPER
Title no. 103-S03
Tests on Precast Concrete Frames with Connections
Constructed Away from Column Faces
by Jyh-Hao Khoo, Bing Li, and Woon-Kwong Yip
A modified assembled configuration is introduced for precast usually located at the beam-column joint cores; or at the
concrete frames in which the connections are constructed on the midspan of a beam. Providing connection in the beam-
beam span and kept away from the column faces so as to avoid column joint region is apparently unfavorable because it
coinciding with the plastic hinge regions during seismic excitations. disturbs the continuity of reinforcement. The congested
An experimental study on the se ismic performances of two full-
reinforcement details in the joints always create difficulties
scale precast concrete subframes adopting the aforementioned
configuration and a monolithically-cast subframe subjected to during the erection stage. Moreover, the beam-column joints
quasistatic simulated seismic loading is presented. The variable can be vulnerable under seismic actions as they are subjected
examined was the connection detail. The performances of the to reverse bending moments and shear forces. The induced
precast concrete frames are evaluated on the basis of ductility, energy shear forces in the joint region can typically be in the order
dissipation capacity, connection strength, and drift capacity. Based of five times the column shear force.4 A precast beam is
on the test results, the precast conc
您可能关注的文档
- 1工程师职称评定条件.doc
- 酒店喷淋水力计算书.doc
- 受力钢筋的弯钩和弯折应符合的规定.doc
- 02地下建筑规划.ppt
- AutoCAD工程量计算.pdf
- 喷淋水力计算.doc
- 液氨储罐规范要求.doc
- 自动洒水喷头布置的探讨.doc
- IL-250称重传感器.pdf
- JCT 610-2011 水泥散装设备 气动开关阀.pdf
- 职业技能培训跨境虚拟实训基地,2025年市场推广策略研究.docx
- 2025年社交电商用户参与度提升策略报告.docx
- 2025-2026学年初中信息技术鲁教版旧版第5册-鲁教版2018教学设计合集.docx
- 2025年建筑装饰行业高质量发展与绿色施工技术分析:行业未来趋势报告.docx
- 2025-2026学年初中信息技术鲁教版旧版第5册-鲁教版2018说课稿合集.docx
- 2025-2026学年小学信息技术(信息科技)六年级 第7册滇人版(2005)教学设计合集.docx
- 银发旅游产业政策环境与适老化旅游产品创新合作模式报告.docx
- 2025年自动驾驶汽车车载人工智能技术应用报告.docx
- 基于2025年新能源汽车充电设备的研发项目成本控制分析报告.docx
- 2025年自动驾驶汽车车载操作系统与软件开发策略分析报告.docx
文档评论(0)