- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Curriculum vitae
Personal Information:
Name : XXXXX
Nationality : Chinese
Sex : Male
Date of birth : 19XX
Age : xxxx
Marital : Married
Passport Detail : Pxxxxxxx
Education and Professional Training:
1. Degree of Bachelor of Engineering in 1992.7
2. Degree of Master of Engineering in 2008.6
3. Certificate of Junior Engineer
4. Certificate of Senior Engineer
Years of Experience:
17 years of civil work experience
Professional Experience:
Period 2009.05~present
Role : Authorized to execute contract
Employer’s Name : xxxxxxxCorporation
Duties Performed :Execution of the work in compliance with the contract and dealing with all related matters of the Project.
Project Name :xxxxxxxx
Name of Client :xxxxxxxxxxxxx
Type of project :Infrastructure work, consisting of road, stormwater pipe line, sanitary sewer pipe ling, fresh water supply pipe line, T.S.E water pipe, sub-station, etc, including excavation, backfill, asphalt, concrete.
Period 2007.07~2009.5
Role :Deputy Chief Engineer of international Department in xxxxxxxxxxx
Employer’s Name : xxxxxxxxxx
Duties Performed :Design, Drafting technical scheme, analysing tender document, pricing Bill of Quantity, Study of Tender Specification of the Project according to that floated tender then negotiation and finalization of contract and Co-ordination with Planning Department to prepare Progress Chart as per the given time condition.
Period 2006.12~2007.07
Role :Deputy project Manager
Employer’s Name :xxxxxxxxxxxxx
Duties Performed :Total management of construction of Concrete Dam powerhouse, Planning of resource including equipment, manpower, and material, finalizing of general construction schedule.
Project Name :xxxxxxx
Name of Client :xxxxxxxx
Type of project :Civil work, consist of one 135m height of concrete dam and powerhouse, inclusive of concrete placement, excavation, backfill.
Period 2004.6~2006.12
Role : Project Manager
Employer’s Name : xxxxxxxxxxxxxxx
Dutie
文档评论(0)