填料的优化组合和低温下脱氮除磷试验研究.doc

填料的优化组合和低温下脱氮除磷试验研究.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Abstract As a new-style technology arising for the past several decades in China  the constructed wetland appears some inherent problems of which the three remarkable problems are as follow First the disposal load is ,in general 0.5-0.8 m3/m2· d which is so low that the occupied area is therefore very huge Second as the operation time in constructed wetland extends with the physical chemical and biological influence on it the infiltration rate is gradually decreasing which in turn lead to the soil clogging phenomena.Clogging will make wastewater difficult to flow through the soil contributing to the dramastical decrease of the purified capability Third the removal efficiency is hardly stable. This experiment applied five varied poles simulating the constructed wetland filled with diversed padding to treat low concentration municipal sewage in low temperature make a reaearch on the corresponding results follow up the variation of the filtration coefficient under the different load and also discuss the removal efficiency of organic compound, Nitrogen and Phosphorus as well the clogging influence on it and in the end suggest the endurable padding depending on the different load. Under the high, middle and low hydraulic load, 2m3/m2· d, 1m3/m2· d, 0.3m3/m2· d respectively the research of low concentration municipal sewage directly flowing into poles indicates these results (1)without any prelimilary treatment after 60 days with the 3 2 the filtration coefficient on the top surface decreased most dramastically.With the high hydraulic load about 2m3/m2· d , the filtration coefficient continuelly decreased in each pole the pole 1 is more resistable to clogging than the rest poles.(2)We suggest apply endurable materials with big pores to resist the potential clogging and recommend that the pole 1 can be exerted to treat wastewater under high hydraulic load while the pole 2 is suitable under middle hydraulic load ih the end the pole 4 and pol

文档评论(0)

ww235998 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档