- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文原文:
This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction prject and risk
The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters building without a certificate of occupation. Also, the defects liability period was only three months .
The roof structure was in place 10 years At first the SAZ decided to go to arbitration, but this failed to yield an immediate solution. The SAZ then decided to proceed to litigate in court and to bring a negligence claim against CABCO. The preparation for arbitration was reused for li
您可能关注的文档
- 材料成型及控制工程专业外文翻译--PSA太阳炉一个测试光伏电池受太阳集中辐射的设备.doc
- 材料成型及控制工程专业外文翻译--金属板料的成形及冲裁.doc
- 材料成型与制造专业外文翻译--冲压成形的特点与板材冲压成形性能.doc
- 材料科学与工程专业外文翻译--内部固化的高性能混凝土与浸泡过的细轻集料的自收缩开裂的预防.doc
- 财务管理毕业论文外文翻译--公司治理与高管薪酬:一个应急框架.doc
- 财务管理专业外文翻译.doc
- 财务管理专业外文翻译--财务风险管理.doc
- 财务管理专业外文翻译--固定资产折旧的税收筹划再认识.doc
- 财务管理专业外文翻译--关于美国跨国公司的成本管理.doc
- 财务管理专业外文翻译--浅析新时期个人所得税纳税筹划.doc
最近下载
- (湘科2024版)科学一年级上册全册教学案.pdf VIP
- 环氧磨石地坪施工方案.doc VIP
- 2024-2025学年统编版(2024)小学道德与法治五年级下册(全册)教学设计及反思(附目录P110完整版).docx VIP
- 四川省2024年普通高等学校高职教育单独招生文化考试(普高类)语文真题及答案解析(真题解析版).docx VIP
- 混龄游戏活动对小班幼儿社会性发展的影响研究.pdf VIP
- 2025道路沥青红外光谱法快速识别技术规程.docx VIP
- 输变电工程标准工艺(变电工程电气分册)2024版.pptx VIP
- 《VFD-E_使用手册》.pdf VIP
- 小学五年级数学课题研究计划.docx VIP
- 2025《基于S7-1200控制器的S电站渗漏排水系统电气控制设计》14000字.docx VIP
文档评论(0)