工程管理专业外文翻译--工程量清单计价模式下的成本控制.docVIP

工程管理专业外文翻译--工程量清单计价模式下的成本控制.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文原文: Works under the bill of quantities Cost control Abstract: The project under the bill of quantities in the project bidding, construction stage and the completed cost control in the focus and methods. Key words: bill of quantities; cost control; tender documents; contract; settlement  Cost control throughout the entire process of project construction, project cost under the bill of quantities should be greater control of project bidding phase, construction phase and completion of the settlement process, it is necessary to strengthen the Bill of Quantities means the process of building in the project application. 1. The contents of the tender documentation to be complete, clear and rigorous  The implementation of the Bill of Quantities, is embodied in the principle of risk sharing, which compiled and made publicly available tender side of quantities, assume the risks of quantities, tender side the list provided under the tender offer, take the risk of price, any one not free to shift the risk factors. To reduce the risk of quantities required quantities of quality and depth of a certain level. Sub-segment of the preparation of quantities to meet the Bill of Quantities Construction Standards mandatory. Sub-segment of Quantities should be based on the unity of the provisions of sub-part of the project the project name, measurement units and the project codes and rules for the preparation of engineering calculation. First, prepare to be a complete description of quantities, such as description of all construction drawings for casing pipe through the floor to be, the list describes the content must be related to a detailed description of this: If the material specifications. Second, the list of items to avoid leakage, lack, such as the cable channel is not explicitly grounded construction drawings, construction specifications, but there are clearly defined list of items should be included, according to specification describes the contents and characteristics of

您可能关注的文档

文档评论(0)

mkt365 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档