- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Meteringv2_answers v3.xls
Sheet3
Sheet2
accenture
Best Practice
Introduce Customer Own Reads, specifically for Special Reads, and potentially Budget Billing can reduce the number of reads conducted by meter readers e.g. 5-10-12% own reads onto IVR
Seek opportunities to improve end-to-end scheduling, allocation and route planning for meter readers.
Effectively processing estimated and aperiodic meter reads
Ability to identify, detect and investigate irregularities
Access rates
Carry out consumption investigation within 3 days
‘High Bill’ complaints
% meter reading outsort - validation errors / day
% of Meter reads on scheduled read date
Meter Reading
Complaints
Device Installation
Works Management
Connect and supply electricity within 24 hours of inspection
Device Managamanet
Minimise the number reads required; particulary for small customers and those which are difficult to access.
Periodic Device Management - Replace device based on installation to avoid revenue loss due to malfunction of old device.
Leverage automated meter reading technology to reduce the time taken for each read and increase productivity of meter readers, and put the sequence and address to the handheld, or other machine
Assignment of meter reader to routes. Readers can be assigned to alternate routes periodically to reduce the likelyhood of special arrangements.
Use master-sub meter technology to ensure the correct of metering
Priority based on both urgency and customer importance
All Service Requests are tracked and managed consistently.
Escalation is automated, providing proactive alerts to affected parties.
Standardize the criteria for escalation processes in order to reduce the amount of wasted work done on cases
How frequently are customer meter reads occurring?
Are there different meter reading frequencies for different customer types (domestic / commercial / inductrial / rural)
What percentage of customer have on-site billing? Whats type of client receives on-site billing?
Do you have a separate team or dep
您可能关注的文档
- A、企业记录(固定式).doc
- A料与B料的显著性检验.doc
- B040014T-201212-分析化学试卷-1.doc
- BEST-GRR.ppt
- Bi3+-Fe3+混合溶液中各组分含量的测定 (论文).doc
- B线出磨P.S.A32.5.xls
- Carrousel氧化沟中的同时硝化.doc
- CD3200中文手册-f第四单元.doc
- CET6核心600词汇.xls
- CGMS的监测机理解析及数据导出.ppt
- 中国行业标准 DB/T 100-2024区域性地震安全性评价.pdf
- 《GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架》.pdf
- GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- DB/T 100-2024区域性地震安全性评价.pdf
- 中国行业标准 GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- 校园周边书店阅读氛围对初中生阅读素养提升的影响研究教学研究课题报告.docx
- 初中校园餐饮卫生监管与食品安全教育创新模式研究教学研究课题报告.docx
- 《文化遗产保护与旅游开发平衡机制的法律法规完善研究》教学研究课题报告.docx
- 《农作物病虫害生物防治技术的经济效益与社会影响分析》教学研究课题报告.docx
- 1 剖宫产术后子宫瘢痕憩室治疗中的并发症预防与护理措施教学研究课题报告.docx
文档评论(0)