吹瓶机基本知识 051022.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吹瓶机基本知识 051022

吹瓶机基本知识 2005.10.22 目录: 一. 吹瓶过程 1. 吹瓶机 – 工艺流程图 2. 机器操作步骤: 一. 吹瓶过程 1. 吹瓶机 – 工艺流程图 吹瓶机示意图: 功能介绍表 (SIDEL) 机器介绍 (KRONES) Blow module Heating module Blowing station Blowing Wheel, infeed/discharge starwheels Infeed starweel Mandrel chain Control panel Control cabinet Water conditioning Pneumatic components Air conveyor Heaters Electrical Air supply Water supply, admission/return Preform infeed rail Preform unscrambler Preform steep conveyor Preform hopper Preform dumper 2. 机器操作步骤: 上胚 瓶胚经过料斗, 上胚皮带, 被送到整理器的顶部, 经过整理, 成直线状排列, 进入上胚导轨. 经过入胚星轮, 瓶胚被送入加热炉的芯轴. 加热和平衡 经过加热炉,瓶胚被加热到90-115°C. 加热时, 可单独调节可调红外线光管的加热百分比. This is achieved with individually controllable infrared tubular radiators, arranged in nine levels. This array allows temperature variation on the preform. This temperature profile ensures the predefined material distribution, i.e., the bottle quality. To prevent overheating, the exterior of the preform is cooled with fans. To prevent deformation, the sensitive neck-finish area is protected by a water-cooled shield. In addition, cooled air is also blown at the neck- finish area. The heating process takes approx. 20 seconds. Afterward the preforms pass through an equilibration zone for optimal distribution of the heat in the preform. Then a starwheel transfers the preforms to the blowing stations. 延伸-吹瓶过程: After the preform enters the blowing station, the base mould is raised, and the entire mould is closed and locked. The heated preforms are held and fixed in place in the mould by means of the neck ring. This prevents deformation of the neck-finish. Even while the mould is being closed, the blowing nozzle descends, the stretching rod moves toward the end cap for stretching, and after a brief delay the pre-blowing air flows in. The duration of the delay determines the thickness of the material in the bottle base. Depending on the preform and bottle type, the pre-blowing pressure is 7-16 bar and lasts between 0.2-0.7 seconds, depending on

文档评论(0)

gooddoc + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档