AC 120.91 Airport Obstacle Analysis.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
AC 120.91 Airport Obstacle Analysis.ppt

PURPOSE This AC Describes Acceptable Methods And Guidelines Re: Takeoff And Initial Climb-out Airport Obstacle Analysis Complies With The Intent Of The Regulatory Requirements Of CFR Part 121, Part 135 Two Methods For The Development Of Engine Out Procedures (EOPS). EOP DEVELOPMENT GUIDELINES Derived from Extensive FAA and Industry Experience Been Used by the Industry for over 13 Years as a DRAFT Document Signed by AFS-1 on May 5, 2006 Applies to Operations Conducted Under Part 121 and Operations of Large Transport and Commuter Category Airplanes Conducted Under Part 135 APPLICABLE REGULATIONS Sections?121.177, 121.189, 135.367, 135.379, And 135.398 The Takeoff Flightpath Must Meet The Specified Obstacle Clearance Requirements In The Event Of An Engine Failure. CFR Part 97 Applies To Standard Instrument Approach Procedures INSTRUMENT PROCEDURES § 97.20 Prescribes Standard Instrument Procedures And Weather Takeoff Minimums: Based On The Criteria Contained In FAA Order 8260.3, U.S. Standard For Terminal Instrument Procedures (TERPS), Other Related Orders In The 8260 Series AFS-1 RESPONSIBILITY The Use Of Air Navigation Facilities, Appliances, And Systems By Aircraft Operating In Established Environments And The National Airspace System (NAS). Policy And Oversight Of Manual And Automated Development And Maintenance Of Terminal And En Route Flight Procedures. FLIGHT TECHNOLOGIES AND PROCEDURES DIVISION (AFS-400) RESPONSIBILITY. Policies, Criteria, And Standards For Establishing And Maintaining Terminal And En Route Flight Procedures Final Authority To Issue, Amend And Appeal Standard Instrument Approach Procedures Under 14 CFR Part 97. “Special” Instrument Approach Procedures Requests For Waivers Of Standards. AFS-410 RESPONSIBILITIES Operational And Flight Technical Aspects Of All Weather Operations. Develops Operational Mitigations for Waivers of Standards Category I, II, And III Approach And Landing Operations Policy, As Well As Lower Than Standar

文档评论(0)

wsh1288 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档