- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Master Contract NO.DC DY2015120601.doc
Master Contract NO.:DC DY2012120601
Lequfied Natural Gas Cooperative Contract
Seller : Dongguan East Oil Natural Gas Co., Ltd
Buyer:
Signing Date:(15 Dec. 2012)( 例)
Valid Period:(15 Dec. 2012—15 Dec. 2017)(例)
Content
1 Preface 3
2 Definition 3
3 LNG Quality 4
4 Cooperation Investment 4
5 Contract Life 7
6 Sellers Responsibility 7
7 Buyers Responsibility 8
8 Contract Execution, Modification, Assignment and Termination 9
9 Enforce Majeure 9
I.Preface
According to the LNG Purchasing Cooperative Agreement signed by Dongguan East Oil Natural Gas Co., Ltd(hereinafter refered to as the seller) and 某某有限公司the principle of equality and mutual benefit as well as being honesty and trustworthy, both parties agree on the following terms under the contract concerning the project construction of LNG Vaporizing Station and buyer’s responsibility of purchasing LNG from the seller after its completion during the contract valid period.
II.Definition
Understanding of the reference words in this contract:
2.1“Liquified natural gas vaporizing station”(hereinafter refer to as LNG Vaporizing Station), which refers to natural gas vaporizing station storing low-temperature liquefied natural gas at or slightly above the normal pressure.
2.2 “Contract life” refers to the valid period since the enforcement date of the contract to the termination date of contract.
3.LNG Vaporizing Station
This project is LNG(Liquified natural gas) Vaporizing Station with a designed capacity of 15000Nm3/d including low temperature storage system, pressurization system, vaporization system, pressure regulation and metering as well as odorization system.
The storage capacity of this station should not exceed 60 cubic meteres with one low temperature storage tank.(this station can use original metering apparatus under the confirmation of both parites)
Descriptions of equipment involved as follows,
No. Name Type Specification Unit Amount Note 1 LNG Storage Tank(Fixed)
Storage Ca
您可能关注的文档
- GBT 5009.144-2015.doc
- GB类、GC2、GC3、GD2级压力管道设计.doc
- GCS-2100B中央控制系统使用手册.doc
- gka2015年深圳市初中毕业生学业考试数学试卷.doc
- GMAT数学考试复习的一些小方法.doc
- GMAT考试复习资料推荐.doc
- GMAT考试常见缩写整理介绍.doc
- GRE作文的本质(Issue篇+Argument篇).doc
- GRE作文高分攻略.doc
- GRE单词同类汇总.doc
- 2023年黑龙江省哈尔滨市道里区新华街道招聘社区工作者真题及参考答案详解1套.docx
- 2023年黑龙江省大庆市肇州县永胜乡招聘社区工作者真题含答案详解.docx
- 2023年黑龙江省牡丹江市海林市新安朝鲜族镇招聘社区工作者真题及参考答案详解.docx
- 2023年黑龙江省哈尔滨市松北区万宝街道招聘社区工作者真题及答案详解1套.docx
- 2023年黑龙江省哈尔滨市道外区新乐街道招聘社区工作者真题含答案详解.docx
- 2023年黑龙江省绥化市北林区吉泰招聘社区工作者真题参考答案详解.docx
- 2023年黑龙江省哈尔滨市香坊区建筑街道招聘社区工作者真题附答案详解.docx
- 2023年黑龙江省哈尔滨市道外区民主乡招聘社区工作者真题附答案详解.docx
- 2023年黑龙江省牡丹江市海林市二道镇招聘社区工作者真题含答案详解.docx
- 2023年黑龙江省大庆市萨尔图区铁人街道招聘社区工作者真题及参考答案详解一套.docx
文档评论(0)