- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MeroweDamDetailsofSiteamp;amp;EngineeringDesign.ppt
Merowe Dam: Details of Site Engineering Design Suzanne Young February 19, 2004 Outline Project aims Details of site Main Nile Climate Topography Geology Engineering Design What are the project aims? Eliminate current deficit in electricity in Sudan Satisfy future demand Contribute to industrial and agricultural development ? employment Raise standard of living for citizens The Main Nile Khartoum to Wadi Halfa, 1500 km Large S bend Most significant feature: Cataracts 1979 – no river, control or storage works Effect of Aswan High Dam Climate July to August, Northern Sudan’s rainy season 50 mm, Merowe’s mean annual rainfall High variability Intensity of storms Hot summers (34 C) and cold winters (20 C) Geology Between third fourth cataract, sandstone channel 100 km below fourth cataract, broad, silty floodplains Between fourth fifth cataract, narrow bed of tough igneous and metamorphic rocks Design origin, basis 1979 study led to design proposals Merowe dam Long in relation to height Extended elaborate spillway structures Concrete structure in main river channel, rockfill dyke on each bank Cont. Control floods using surface spillways and deep sluices Sluices permit drawdown in dry season if necessary Sluices used for partial drawdown prior to floods Merowe Dam Overview Located 350 km (220 mi) north of Khartoum Installed capacity: 10 units of 125 MW – 1250 MW Approx. 10 km long, 65 m high Reservoir, 170 km long, 476 square km surface area Dam structures Dam of ~65 m height consist of: Concrete faced rockfill dam (right bank), ~4,800 m long Rock and earthfill dam (left bank), ~4,000 m long Concrete dam ~520 m long, including powerhouse for 10 turbines, spillway and sluices Helpful dam terminology Cofferdam Temporary dam built to keep riverbed dry to allow construction of permanent dam Drawdown The lowering of a reservoir’s surface elevation and water volume by releasing (spilling or generating) the reservoir’s water at a rate greater than the rate at which wate
您可能关注的文档
- 3.4 Quadratic Variation.ppt
- 40 GHz MMIC Power Amplifier in InP DHBT Technology.ppt
- 53071 Hydraulics and HydrologyProject #1Pelton Turbine.ppt
- 6.3二叉树的遍历.ppt
- 911 services wireline, wireless and VoIP.ppt
- A 2nd Opinion on CaRFG3T50 & Supply.ppt
- Abnormal Uterine Bleeding.ppt
- ACADEMIA SINICAIBMS.ppt
- AccessPharmacy.ppt
- AccessPharmacy手机版简介.ppt
- MICROBES.ppt
- Microbial DiversityGram-Negative Strategies for Survival.ppt
- Middle School 8 period day.ppt
- Mission Costs at NASA.ppt
- MODELING THE PHARMACOGENOMICS OF DEPRESSION.ppt
- Module 5 My hometown and country 我的家乡与国家.ppt
- MOODY INTERNATIONAL.ppt
- Names, Scopes and Bindings.ppt
- Narkotikaforbrytelser og doping.ppt
- Navigation Set Hierarchy.ppt
文档评论(0)