- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
53071 Hydraulics and HydrologyProject #1Pelton Turbine.ppt
53:071 Hydraulics and HydrologyProject #1Pelton Turbine Marian Muste, Gokhan Kirkil and George Constantinescu Problem Statement A children’s museum in Colorado has purchased a small Pelton turbine for its new display on renewable energy. Problem Statement The museum wishes to operate the turbine (with available flows) and sell the power on the open market. You have been hired as a consultant to the museum. Project Objectives Your jobs are: 1.Using the measurements of relevant hydraulic and electrical variables for various loads in the power grid of the hydroelectric power system, determine energy conversion efficiency (hydraulic, electric and total). 2.Determine energy (kWh) that can be generated from the laboratory-scale Pelton turbine, and the revenue it can generate ($/year) for the museum. Site Information The effective head (pressure) for operations at the site is about 51.5 psi (Havailable). Variations in the forebay elevation are assumed to be minor. Operational Information The museum will operate the turbine 7 days a week (9 am to 4 pm). The museum has secured water rights to divert flows from the South Platte River. The allotted diversion depends on the average monthly flow rate in the river. Laboratory Component Determine the energy conversion efficiency (hydraulic and/or electrical and total) of the laboratory-scale Pelton turbine for the proposed operating conditions (Havailable, Q) under different loads (constant rotational speed) or under different rotational speeds (constant discharge). The project is designed to allow documenting the efficiency of the energy conversion in a hydropower plant. Engineering Analysis Components Compute the energy produced (kWh/yr) if operated as planned. Estimate the revenue that can be generated if the energy is sold on the open market ($/year). Principle Laboratory Apparatus Laboratory Objective 1 Determine energy conversion efficiency (hydraulic, electric and total) for the laboratory-scale Pelton turbine for va
您可能关注的文档
- §1.2集合的运算.ppt
- §7-3 周转轮系传动比计算.ppt
- (a.k.a. Phase I trials).ppt
- 1.1.1 正弦定理的推导.ppt
- 1.3人口分布与 人口合理容量.ppt
- 1.什么叫旋转对称图形?.ppt
- 1.我的背景 ?.ppt
- 1.苹果为什么下落?.ppt
- 100 GbE Network implementations, challenges and testing.ppt
- 13C-NMR, 2D-NMR, and MRI.ppt
- 高考语文阅读理解《让家书文化融入百姓生活——家书的审美价值》含答案.docx
- 甘肃省武威市第三中学九年级化学上册 第三单元 课题1 分子和原子教学设计 (新版)新人教版.docx
- 第九课 感恩父母(教学设计)全国通用六年级上册综合实践活动.docx
- 2024届河南省新乡许昌平顶山高三第三次测评语文试卷含解析.doc
- 2023年-2024年房地产估价师之基本制度法规政策含相关知识高分通关题库A4.pdf
- 2024届新疆师范大学附属实验高中高三3月份模拟考试语文试题含解析.doc
- 河南省小学六年级下册数学期末测试卷含答案【基础题】.pdf
- 2024年江西省都昌县施工员之设备安装施工基础知识资格考试真题题库附参考答案(精练).docx
- 2024新版钢板租赁合同完整版doc-2份.pdf
- 部编版六年级语文下册《文言文二则》精品教案(含设计意图、课堂作业、教完整版724262050.pdf
文档评论(0)