网站大量收购独家精品文档,联系QQ:2885784924

53071 Hydraulics and HydrologyProject #1Pelton Turbine.ppt

53071 Hydraulics and HydrologyProject #1Pelton Turbine.ppt

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
53071 Hydraulics and HydrologyProject #1Pelton Turbine.ppt

53:071 Hydraulics and Hydrology Project #1 Pelton Turbine Marian Muste, Gokhan Kirkil and George Constantinescu Problem Statement A children’s museum in Colorado has purchased a small Pelton turbine for its new display on renewable energy. Problem Statement The museum wishes to operate the turbine (with available flows) and sell the power on the open market. You have been hired as a consultant to the museum. Project Objectives Your jobs are: 1.Using the measurements of relevant hydraulic and electrical variables for various loads in the power grid of the hydroelectric power system, determine energy conversion efficiency (hydraulic, electric and total). 2.Determine energy (kWh) that can be generated from the laboratory-scale Pelton turbine, and the revenue it can generate ($/year) for the museum. Site Information The effective head (pressure) for operations at the site is about 51.5 psi (Havailable). Variations in the forebay elevation are assumed to be minor. Operational Information The museum will operate the turbine 7 days a week (9 am to 4 pm). The museum has secured water rights to divert flows from the South Platte River. The allotted diversion depends on the average monthly flow rate in the river. Laboratory Component Determine the energy conversion efficiency (hydraulic and/or electrical and total) of the laboratory-scale Pelton turbine for the proposed operating conditions (Havailable, Q) under different loads (constant rotational speed) or under different rotational speeds (constant discharge). The project is designed to allow documenting the efficiency of the energy conversion in a hydropower plant. Engineering Analysis Components Compute the energy produced (kWh/yr) if operated as planned. Estimate the revenue that can be generated if the energy is sold on the open market ($/year). Principle Laboratory Apparatus Laboratory Objective 1 Determine energy conversion efficiency (hydraulic, electric and total) for the laboratory-scale Pelton turbine for va

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档