- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Chapter14amp;ndash;ResourcePlanning(MRPandERP).ppt
Chapter 14 – Resource Planning (MRP and ERP) Operations Management by R. Dan Reid Nada R. Sanders 2nd Edition ? Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH Types of Demand There are two types of demand. Independent Demand Is the demand for finished products Does not depend on the demand of other products Needs to be forecasted Dependent Demand Is the demand derived from finished products Is the demand for component parts based on the number of end items being produced and is managed by the MRP system Evolution of Material Planning Systems Back in the sixties, manufacturing planning systems were reorder point systems that simply determined when and how much to order First MRP systems translated a master schedule of final products into time-phased net requirements for subassemblies, assemblies, and parts Closed-loop MRP included production planning, master scheduling, and capacity requirements In mid 1970’s, MRPII systems added functionality to plan and execute all internal functions An Overview of MRP MRP uses the concept of backward scheduling to determine how much and when to order and replenish The MPS module contains the authorized schedule The BOM module contains the product structure for each unique product The Inventory Record module keeps track of the inventory status for each item in the database MRP output includes schedules for all internal activities and parts as well as orders for all supply chain items Input/Output - MRP Process Objectives of MRP Determines the quantity and timing of material requirements Determines what to order (checks BOM), how much to order (lot size rules), when to place the order (need date minus lead time), and when to schedule delivery (on date needed) Maintain priorities In a changing environment, MRP reorganizes priorities to keep plans current and viable Building a CD Cabinet With MRP MRP Inputs - Authorized MPS From the authorized MPS, we calculate when we need to have replenishment orders of CD ca
您可能关注的文档
- 2导数的几何意义.ppt
- 3. b p m f.ppt
- 4–.ppt
- 46-320-01Tests and Measurements.ppt
- 518人力银行.ppt
- 7-Segment Display and Count by 16.ppt
- 7.4 利用轴对称设计图案.ppt
- A 16-Bit Invertible Architecture for H.26L.ppt
- A birthday party.ppt
- A Catalogue of the Plants of Madagascar.ppt
- Chapter 14 – Resource Planning.ppt
- Chapter 14 - Company Analysis and Stock Valuation.ppt
- Chapter 14 An Introduction to Homeland Security.ppt
- Chapter 14 Carbohydrates.ppt
- Chapter 14 Ethers, Epoxides, and Sulfides.ppt
- Chapter 14 Event-Driven Programming.ppt
- Chapter 14 Foreign trade law.ppt
- Chapter 14 Identity.ppt
- Chapter 14 Income Taxes & Financial Accounting.ppt
- Chapter 14 Lecture.ppt
文档评论(0)