Chapter 18Materials Requirements Planning.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Chapter 18Materials Requirements Planning.ppt

Chapter 18 Materials Requirements Planning Material Requirements Planning (MRP) Bill of Material MRP Logic and Calculations Lot Sizes, Safety Stock and Time Fences MRP II MRP Management Issues Material Requirements Planning Defined Materials requirements planning (MRP) is the logic for determining the number of parts, components, and materials needed to produce a product. MRP provides time scheduling information specifying when each of the materials, parts, and components should be ordered or produced. Dependent demand drives MRP. Material Requirements Planning System Based on a master production schedule, a material requirements planning system: Creates schedules identifying the specific parts and materials required to produce end items. Determines exact unit numbers needed. Determines the dates when orders for those materials should be released, based on lead times. MRP Input: Bill-of-Material List of components quantities needed to make product Provides product structure (tree) Parents Children Shows low-level coding Lowest level in structure item occurs Top level is 0; next level is 1 etc. Bill-of-Material Product Structure Tree Product Structure Thinking Challenge The demand for product A is 50. How many of each component is needed to satisfy demand? Product Structure Solution Lead Times Product Structure MRP Scheduling Terminology Gross Requirements: demand for an item from: independent demand independent demand dependent demand MRP Scheduling Terminology Scheduled receipts – orders that have already been released (i.e., an open order) and that are scheduled to arrive at the beginning of the period. Projected available balance (On-hand) – amount of inventory at the beginning of a period MRP Scheduling Terminology Net requirements – Planned order receipt – Planned order release – MRP Formulas NRt = GRt - OHt – SRt (0 if negative) OHt = OHt-1 + SRt-1 + POReceiptt-1 – GRt-1 – SS MRP Example - One item’s complete record Starting information MR

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档