Jun CaoInstitute of High Energy Physics, Beijing.ppt

Jun CaoInstitute of High Energy Physics, Beijing.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Jun CaoInstitute of High Energy Physics, Beijing.ppt

J. Cao (IHEP) Daya Bay Neutrino Experiment Daya Bay Neutrino Experiment Jun Cao Institute of High Energy Physics, Beijing Neutrino Oscillation Reactor Neutrino Physics Goal The proposed Daya Bay Experiment will measure sin22?13 to 0.01 or better at 90% C.L. in a three-year run (2001). And a direct measurement of ?m231 Location of Daya Bay The Site Tunnel Layout Muon Simulation A Versatile Site Fast measurement: One near site + mid site Sensitivity ~ 0.03 in a one year run 40 ton/site, reactor error 0.7% Detector Three-layer structure: I. target: Gd-loaded scintillator, 20 ton II. gamma catcher: normal scintillator, 45cm III. Buffer shielding: mineral oil, ~45cm Possibly with reflection on top and bottom ~200 8”PMTs mounted in oil Veto Background Systematics Sensitivity IHEP Detector Prototype Aberdeen Tunnel Exp. Hong Kong University Chinese University of Hong Kong. Started in Jun. 2005 ~ 240m Overburden To study cosmic muon, neutron production, possibly cosmogenic isotopes. Geological Survey * 3rd International Conference on Flavor Physics, Oct. 3-8, 2005 National Central University Chung-li, Taiwan Neutrino Mixing: PMNS Matrix Atmospheric Solar Reactor and LBL Known: |Dm232|, sin22q23, Dm221, sin22q12 Unkown: sin22q13, dCP, Sign of Dm232 Capture on H, or Gd, Cd, etc. Delayed signal Prompt signal q12: ~ 55km q13: ~ 2km Beta beam ? 1e-4 ? Reactor Neutrino: Fast, Cheap, and Clean! Mature technique, Chooz, Palo Verde, KamLAND but challenging on controlling systematics. Two metropolises Hong Kong 55 km ?12 maximum ShenZhen 45 km Daya Bay NPP 2.9GW?2 LingAo NPP 2.9GW?2 LingAo II NPP 2.9GW?2 Under construction (2010) LA: 40 ton Baseline: 500m Overburden: 98m Muon rate: 0.9Hz/m2 Far: 80 ton 1600m to LA, 1900m to DYB Overburden: 350m Muon rate: 0.04Hz/m2 DYB: 40 ton Baseline: 360m Overburden: 97m Muon rate: 1.2Hz/m2 Access portal Waste transport portal 8% slope 0% slope 0% slope 0% slope Mid: Baseline: ~1000m Overburden: 208m Horizontal

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档